Similar Projects
Corporation Yard Permimeter Fence Replacement - 1000509 - City of San Luis Obispo
Infrastructure
Conception
$450,000 CJ est. value
San Luis Obispo, CA 93401

Serrano, Bressi, Dana Pipe Replacement - 1000093 - City of San Luis Obispo
Infrastructure
Conception
$1,300,000 CJ est. value
San Luis Obispo, CA 93401

Conservmart / San Luis Obispo
New Construction, Infrastructure - 3,711 SF
Design
$1,000,000 CJ est. value
San Luis Obispo, CA 93401

Treana Winery Expansion
Addition, New Construction, Infrastructure - 15,000 SF
Design
$3,000,000 CJ est. value
Paso Robles, CA 93446

Install Beautification, Transportation Art, and Safety Measure Enhancement
Infrastructure
Bidding
$440,000 CJ est. value
Atascadero, CA 93422

RFP D/B - Paulding Middle School Mixed-Use Building
New Construction, Infrastructure - 8,500 SF
Bidding
$6,500,000 CJ est. value
Arroyo Grande, CA 93420

San Luis Obispo High School Modernization Project - Site Work Only
Renovation, Infrastructure
Post-Bid
$3,000,000 est. value
San Luis Obispo, CA 93401

Community Electric Vehicle Charging Infrastructure Deployment project
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
San Luis Obispo, CA 93401

Temporary Relief of Waste Water Treatment and Sewage Plant Operator
Renovation
Results
Blythe, Chino, Chowchilla, Coalinga, Corcoran, Crescent City, Imperial, Ione, Jamestown, Sacramento, Susanville, Tehachapi, Wasco, CA 91710

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Measure K-14 Street Rehabilitation and Repair Project
Infrastructure
Construction
$2,327,327 CJ est. value
Grover Beach, CA 93433

Verde/Luneta/Ramona/Broad Sewer Replacement
Infrastructure
Construction
$1,360,489 CJ est. value
San Luis Obispo, CA 93401

Idle Hands Mixed-Use Building
New Construction, Infrastructure - 8,424 SF
Pending Verification
$2,500,000 CJ est. value
San Luis Obispo, CA 93401

Park Fermé
New Construction, Infrastructure, Renovation - 6,873 SF
Pending Verification
$1,900,000 CJ est. value
Paso Robles, CA 93446

Waterline Replacements: Chorro - Highland to Meinecke - 1000547 - City of San Luis Obispo
Infrastructure
Conception
$1,200,000 CJ est. value
San Luis Obispo, CA 93401

Last Updated 01/19/2023 10:02 AM
Project Title

RFQ D/B - New Wastewater Reclamation Facility (WRF)

Physical Address View project details and contacts
City, State (County) San Luis Obispo, CA 93405   (San Luis Obispo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected January 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $27,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The State of California, acting through the Board of Trustees of the California State University, hereinafter called Trustees or BOT, on behalf of California Polytechnic State University San Luis Obispo, hereinafter called University, will soon begin the process of seeking qualifications and proposals from Design-Build General Contractors (Proposers) to provide design and construction services for a new Wastewater Reclamation Facility (WRF) Project. The University is now in the process of developing a list of Collaborative Design-Build General Contractor firms to be considered for the project and is currently seeking non-mandatory letters of interest from firms that wish to be considered for inclusion on that list. PROJECT SCOPE: The project involves the design and construction of a package plant wastewater reclamation facility employing membrane bioreactor (MBR) technology, UV disinfection and related appurtenances, to produce tertiary treated and disinfected reclaimed water that is in accordance with General WDR Order No. R3-2020-0020 to utilize for campus irrigation purposes. PROPOSED PROJECT ELEMENTS: Proposed project elements include, but not limited to: - WRF site development, including all required earthwork and U/G utility infrastructure, in preparation for the installation of a package plant to produce reclaimed water which meets the standards set forth in the general order referenced herein - Procurement and installation of the package plant, inclusive of a 400,000 to 500,000 gallon equalization tank, and all related appurtenances - Design and construction of a classroom building with ample parking at the WRF site to provide interdisciplinary learning opportunities consistent with the Cal Poly pedagogy of 'Learn by Doing' - Design and construction of lift station(s) and related force mains to convey wastewater generated on campus to the WRF - Design and construction of a 120 acre-foot lined earthen reservoir - Design and construction of a small swine digester - Procurement and installation of emergency back-up generators for the WRF and each lift station - Design and installation of a WRF-related SCADA system and integration into Campus system - Design, permitting, and installation of (4) pipeline crossings of UPRR tracks PROPOSED PROJECT DELIVERY METHOD: The delivery method for this project is Collaborative Design-build. The project will fully embrace the principles of collaboration and integrated project delivery that emphasizes a cooperative approach to problem-solving. The University expects the collaborative design-build team, as part of the project team, to deliver this project by creating a culture of open and honest communication, utilizing team principles efficiently and effectively, and establishing a collaborative environment where the project team contributes its best efforts for the benefit of the project as a whole. SELECTION PROCESS: The University will use a phased approach to select the collaborative design-build team: the builder will be selected with an RFQ/RFP process, and then the University will work collaboratively with the selected builder to select the design engineer, and subsequently, all other team members. This process selects the Collaborative Design-Builder on qualifications and proposed fees (a design competition is not utilized). Non-mandatory letters of interest should be limited to one 8-1/2x11 page and include a link to the firm's website. The University is seeking firms which have demonstrated Collaborative or Progressive Design build experience, have experience with design management, civil improvements, utility infrastructure, and water/wastewater work, and have proven ability to work with multiple public agencies in a collaborative project delivery environment to provide the best possible outcome, on schedule, and within budget. Deadline for RFQ questions 11/15/2022 Last day to submit application for prequalification on PlanetBids: 11/14/2022 The design-build contract value for both phases is $25-27 million. RFP distributed to finalists 12/9/2022 RFP responses due 1/17/2023 Virtual Office Visit #1 12/16/2022 Virtual Office Visit #2 1/6/2023 Finalist Interviews 1/27/2023 Successful proposer announced 2/1/2023 Agreement and NTP 2/15/2023

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents