Similar Projects
Thornton Road Improvements Project Phase I - Selma Highway to Peters Road
Infrastructure
Bidding
Casa Grande, AZ

Sunland Gin Road Project
Infrastructure
Bidding
$4,500,000 to $5,000,000 est. value
Florence, AZ 85132

AZ FTNP CAGR 10(2), Entrance Road
Post-Bid
$750,000 to $1,000,000 est. value
Coolidge, AZ 85128

Anthem at Merrill Ranch CFD 1, Phase XX -Constitution Way/National Way Concrete, Paving and Landscape
Post-Bid
Florence, AZ

New Facilities (Construction of New Roads)
Results
Less than $2,192,000 est. value
Maricopa, AZ 85138

Construction Manager at Risk for Aquatics Center and Northern Avenue Reconstruction
Results
Coolidge, AZ 85128

Attesa Motorsports Complex Phase 1
New Construction
Construction
Casa Grande, AZ 85122

Santa Rosa Pavement Reconstruction Project
Infrastructure
Bidding
$800,000 to $1,000,000 est. value
Casa Grande, AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

System Preservation (Restoration/Rehab/Resurface)
Results
Less than $3,000,000 est. value
AZ

Construction Manager at Risk for East-West Corridor Roadway Improvements
Post-Bid
Maricopa, AZ

Safety Improvements
Results
Less than $250,000 est. value
Casa Grande, AZ

Mission Royale Community Facilities District Parcel 5 Public Improvements
Infrastructure
Post-Bid
Casa Grande, AZ

Gary Road Improvements Empire Boulevard to Combs/Riggs Road
Results
Less than $3,519,193 est. value
Casa Grande, AZ 34994

Mission Royale Community Facilities District Parcel 6 Public Improvements
Infrastructure
Post-Bid
Casa Grande, AZ

Last Updated 10/05/2021 11:24 AM
Project Title

Crack-Fill All Asphalt Areas (Parking Lots And Drive Lanes) Maricopa, Az

Physical Address View project details and contacts
City, State (County) Maricopa, AZ 85138   (Pinal County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Crack-fill Asphalt Parking Lots and Drive Lanes: Schedule with facilities department. Barricade areas as needed. Sweep and Blow out cracks in the asphalt with compressed air and apply Craftco PolyFlex (or equivalent) Hot Crack Sealant to all cracks over ΒΌ inch wide

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents