Similar Projects
Skilcraft Expansion
Addition, Infrastructure - 22,000 SF
Conception
$8,400,000 CJ est. value
Hebron, KY 41048

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Plantation Point Commercial Street Improvements
Infrastructure
Bidding
$321,000 CJ est. value
Florence, KY 41042

Roger Lane Street Improvements and Plantation Drive Street Improvements
Infrastructure
Bidding
$184,000 CJ est. value
Florence, KY 41042

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Engineering Services for Water Main Expansion
Infrastructure
Post-Bid
Burlington, KY

Baseball Field Backstop Safety System
Results
Union, KY 41091

Locust Street Water Line Replacement and Brookwood Drive Sewer Force Main Replacement
Infrastructure
Results
$328,000 est. value
Walton, KY 41094

Florence Apartments
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Florence, KY 41042

Residence Inn by Marriott / Florence
New Construction, Infrastructure - 104,321 SF
Pending Verification
$20,000,000 CJ est. value
Florence, KY 41042

Langley Bullock Industrial Development / Hebron
New Construction, Infrastructure - 230,000 SF
Design
$123,510,000 CJ est. value
Hebron, KY 41048

Magnolia Trace Area Street Improvements - Phase 1
Infrastructure
Bidding
$454,000 CJ est. value
Florence, KY 41042

New Water Services Installation
Infrastructure
Post-Bid
Burlington, KY

Weaver Road (KY 842) Sidewalk
Infrastructure
Results
$1,947,464 CJ est. value
Florence, KY 41042

Last Updated 11/28/2022 04:37 PM
Project Title

Garage and Terminal Bridge Pipe Replacement

Physical Address View project details and contacts
City, State (County) Hebron, KY 41048   (Boone County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $11,887,560 [brand] Estimate
Plans Available from County Agency - 10/24/22
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes replacing the pipes in the Terminal 2 and Terminal 3 parking garages, as well replacing specific inlets noted on the plans, and replacing the existing pipes on the Terminal Bridge as noted in the contracted documents. The project also includes additional drainage and applying a coating to existing inlets to extend life of inlets in the garage. Bidders shall provide a Proposal Bond in an amount not less than 5% of the total main bid amount as specified. The successful bidder shall provide Payment and Performance Bonds by a surety company duly authorized to do business in the Commonwealth of Kentucky in the amount of one hundred percent (100%) of the contract amount. The Owner reserves the right to waive any informality or irregularity in any bid or bid guaranty, to reject any or all bids, to award or refrain from awarding a contract for the work, and to negotiate with the apparent qualified responsible bidder to such extent as may be beneficial to the Owner. Online Q&A Yes Q&A Deadline 10/24/2022 11:59 PM (EDT)

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents