Similar Projects
2021 Sewer Line Rehabilitation Project
Bidding
Clifton, CO 81520

2021 Preventative and Critical Lining
Bidding
$3,600,000 to $4,000,000 est. value
Denver, CO

Denver Coliseum Storm Drain Repair
Post-Bid
Denver, CO 80202

Cherry Creek Interceptor Project
Post-Bid
Parker, CO

Storm Drainage Rehabilitation and Improvements
Results
Longmont, CO 80501

2020 Cherrymoor South Interceptor Rehabilitation
Results
Cherry Hills Village, CO 80113

Cherry Creek Interceptor Project - Trenchless Construction Portion
Post-Bid
Parker, CO

South Englewood Storm Sewer Maintenance
Results
Englewood, CO 80110

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

2019 Ridge Road Storm Sewer Project
Results
Less than $248,850 est. value
Littleton, CO 80120

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

2020 Townwide Storm Pipe Camera and Vacuum Cleaning
Results
$30,000 to $50,000 est. value
Parker, CO

Stormwater Facility Maintenance
Post-Bid
Canon City, CO

Tollgate and Sand Creek Interceptor Diversion Structures Rehabilitation Phase 2
Results
$3,210,000 to $3,370,500 est. value
Aurora, CO 80012

2020 Sikis Subdivision Sewer Replacement Project Phase II
Post-Bid
Cortez, CO 81321

Reported 01/18/2020 12:00 AM
Project Title

CR Water Projects Request for Pre-qualifications

Physical Address View project details and contacts
City, State (County) Castle Rock, CO 80104   (Douglas County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide construction services for various CR Water projects. Projects may include water transmission pipelines up to 30-inches, storage tank construction and demolition, water facilities maintenance; water distribution rehab and replacement; and wastewater collection facilities; sewer and manhole rehabilitation and replacement; sewer interceptor projects; horizontal directional drilling; guided auger boring.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents