Similar Projects
DPS/DMV Headquarters Boiler Replacement
Alteration
Bidding
$250,000 to $400,000 est. value
Blythewood, SC 29016

Facilities Management Building HVAC and Electrical Replacement - 2nd Floor Mechanical Renovations
Alteration
Bidding
$800,000 to $850,000 est. value
Columbia, SC 29201

Aerco Wizard Steam Fired Water Heater
Post-Bid
Columbia, SC 29210

PVI Water Heater Replacement
Post-Bid
Blythewood, SC 29016

Aerco Smartplate Water Heater
Results
Less than $33,420 est. value
Columbia, SC

Gressette Building Combined Mechanical Projects
Results
$656,222 est. value
Columbia, SC

SC Department of Archives and History - Boilers Blowdown Separator
Post-Bid
$25,000 to $35,000 est. value
Columbia, SC 29223

Hot Water Boilers - Midlands Eval. Center
Results
$48,800 est. value
Columbia, SC 29210

UOFSC FY21-1206 Flora-1st Floor Mechanical UPFIT
Post-Bid
$300,000 to $400,000 est. value
Columbia, SC 29201

Kirkland Correctional Institution - Boiler Replacement
Results
$680,000 to $739,725 est. value
Columbia, SC

South Carolina Archives and History Building - Replace Hot Water Heater(S)
Post-Bid
$35,000 to $40,000 est. value
Columbia, SC 29223

Water Treatment Services
Term Contract
Results
Columbia, SC 29201

J045--Boiler Life Expectancy and Damage Assessment Inspection
Post-Bid
Columbia, SC 29209

Boiler/Water Heater Penthouse
Results
Columbia, SC 29210

Autoclave And Boiler Maintenance - Hollings Marine Laboratory
Post-Bid
Charleston, SC 29412

Last Updated 08/03/2021 10:43 AM
Project Title

Manning Correctional Institution - Boiler Replacement

Physical Address View project details and contacts
City, State (County) Columbia, SC 29203   (Richland County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 to $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rerouting existing hydronic heating water, domestic hot water, and domestic hot water recirculation piping to new Owner provided Pre-Engineered Boiler House (PEBH) to serve the existing Wards/Dormitory Building. Contractor shall be responsible for all utility piping and wiring 5’ outside of the building footprint to serve the PEBH. Contractor shall demolish all existing steam piping and equipment serving the Prison Industries Building and install a new gas-fired radiant heating system and contro.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents