Similar Projects
Wastewater Treatment Plant Construction
New Construction
Design
Sterling, IL

Wastewater Treatment Plant Improvements
Renovation
Bidding
$180,000 est. value
Ridge Farm, IL

Coldwater Creek WWTF Repairs and Improvements (2023)
Renovation
Bidding
$8,200,000 est. value
IL

Wastewater Treatment Facility Controls Upgrade
Post-Bid
Davis Junction, IL

Sewage Treatment Plant
Post-Bid
Hudson, IL 61748

Water System Disinfection Conversion
Results
Northbrook, IL 60062

Wastewater Treatment Facility Improvements
Results
Less than $7,120,000 est. value
Stockton, IL

Screen Channel Upgrades
Renovation
Bidding
$25,000 est. value
Island Lake, IL

Bar Screen Replacement Project
Renovation
Post-Bid
Toluca, IL

Installation of Disc Filters and Other Improvements at The Hanover Park Water Reclamation Plant
Results
Less than $3,600,000 est. value
Chicago, IL

West Sewage Treatment Plant Improvements
Renovation
Bidding
$600,000 est. value
Crest Hill, IL

Wastewater Treatment Facility UV Disinfection
Infrastructure
Post-Bid
Metropolis, IL

Furnish, Deliver and Install Coarse Screensat the Stickney Water Reclamation Plant
Results
Less than $6,000,000 est. value
Cicero, IL 60804

Electric Motor Rehabilitation
Renovation
Post-Bid
$380,000 est. value
Chicago, IL

Building B - Grit Tank Cover and Odor Control
Results
$361,000 to $437,000 est. value
Oswego, IL

Last Updated 05/18/2022 04:28 PM
Project Title

Design-Build Digester Rehabilitation

Physical Address View project details and contacts
City, State (County) Libertyville, IL 60048   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design, Project Management and Construction Services Utilize existing design plans/specifications for digester rehabilitation to establish modified scope of work. Develop the documents as necessary to design a complete installation and/or rehabilitation. Coordinate outage, access, equipment locations, and construction activities with the Village. Jobsite Safety. Construction documentation. Provide commissioning of the digester and startup assistance. Maintain budget and schedule. Remove sludge from the digester – quantity determined in the conceptual stage. Repair Concrete in the Digester. Furnish and install digester cover and interior concrete coating systems. Furnish and install digester cover repair. Furnish and install gas piping and valves. Other construction activity as established in design process.

Details

Sewage Treatment Plant, New Construction.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents