Similar Projects
Last Updated | 10/05/2022 08:04 PM |
Project Title | Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb, Gutter, Sidewalk and Ramps and Pavement Markings on Washington Street |
Physical Address | View project details and contacts |
City, State (County) | Windsor charter Township, MI 48821 (Eaton County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $287,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 0.39 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps and pavement markings on Washington Street from Bridge Street to the southeast village limits of Dimondale in the village of Dimondale, Eaton County. This is a Local Agency project. Control Sec Job No Federal No STU 23000 205736A 22A0761 Net classification required for this project is 287 Cb In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of J. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. 2210 043 - Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb, Gutter, Sidewalk and Ramps and Pavement Markings on Washington Street |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |