Similar Projects
Reported | 05/28/2022 12:00 AM |
Project Title | Replace Shower Heads in PTRP (Va-22-00009630) |
Physical Address | View project details and contacts |
City, State (County) | San Antonio, TX (Bexar County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | $25,000 to $100,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Renovation of a mixed-use development in San Antonio, Texas. Completed plans call for the renovation of a medical facility. THIS IS A PRESOLICIATION NOTICE - A REQUEST FOR QUOTE POSTED ON OR ABOUT April 5, 2022. Replace Shower Heads and Drain Lines South Texas VAHCS 36C25722Q0438 The Contractor/Vendor will Replace Shower Heads and Drain Lines at the San Antonio, TX VAHCS. The NAICS code for this procurement is 238220 with a small business size standard of $16.5 M. This project will be 100% set-aside for Service-Disabled Veteran-Owned Small Businesses, as stated below. The POC for this project will be Karen Battie. email at Karen.battie@va.gov. Important Notice: Apparent successful offerors must apply for and receive verification from the Department of Veterans Affairs Center for Verification and Evaluation (CVE) in accordance with 38 CFR Part 74 and VAAR 819.70 by submission of documentation of Veteran status, ownership and control sufficient to establish appropriate status, offerors must be both VISIBLE and VERIFIED by the Department of Veteran Affairs Center for Veterans Enterprises prior to submission of offer. Failure to be both VERIFIED by CVE and VISIBLE on VetBiz prior to submission of offer will result in the offeror's proposal being deemed non-responsive. All offerors are urged to contact the CVE and submit the required documents to obtain CVE verification of their SDVOSB status if they have not already done so. The method of contractor selection has not been determined at this time. The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 240 days days after receipt of notice to proceed. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |