Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Citywide Valve Replacement Project
Term Contract
Bidding
South Gate, CA

Phase 3 Arden Service Area Pipe and Meter Installation
Infrastructure
Bidding
$30,519,000 est. value
CA

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Professional Engineering Services For Water System Improvements In Madera County Maintenance District No. 36 Eastin Arcola
Infrastructure
Post-Bid
Madera, CA

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

Replace Waste Lines
Alteration
Design
$1,000,000 to $5,000,000 est. value
San Diego, CA

Southeast Water Pollution Control Plant Hvac And Mechanical Upgrades
Alteration
Bidding
$8,000,000 to $8,500,000 est. value
San Francisco, CA

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

Construction Management for Alvarado 2nd Pipline
Term Contract
Bidding
$300,000 to $350,000 est. value
San Diego, CA

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Reported 03/18/2022 12:00 AM
Project Title

Chilled Water System

Physical Address View project details and contacts
City, State (County) San Diego, CA   (San Diego County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Commander, Fleet Readiness Center (COMFRC) Procurement Group (PG), in support of the Fleet Readiness Center Southwest (FRCSW) – North Island, intends to procure two (2) Chilled Water System that are used to store and distribute chilled water to eight high temperature aircraft component testing stations at FRCSW, North Island.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents