Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

13.2KV Line Replacements Project
Alteration
Bidding
$200,000 est. value
Miami, OK

Two Generator Light Towers for Emergency Management
Alteration
Bidding
$519,000 est. value
Shawnee, OK

Installation of Solar Electric Power System
Post-Bid
Wright City, OK

Electrical Contractor
Post-Bid
Muskogee, OK

Right-Of-Way Clearance
Results
OK

Installation Swap-Out of Residential Electric Meters
Alteration
Results
Ponca City, OK

138 FW Generator and Electrical Upgrades
Term Contract
Design
$100,000 to $250,000 est. value
Tulsa, OK 74115

Surgical Light Upgrade Rooms 3 and 5 Northeastern Health System
Alteration
Bidding
$1,500,000 est. value
Tahlequah, OK 74464

Hanger Fans
Term Contract
Post-Bid

Muskogee Site Lights Renovation
Alteration
Results
$40,000 est. value
Tahlequah, OK 74464

Shannon Springs Electrical Work
Alteration
Bidding
$150,000 est. value
Chickasha, OK 73018

Idle Service Removal
Alteration
Post-Bid
Beaver, OK

City Hall Landscape/Lighting Parking Improvements
Infrastructure, Alteration
Results
Less than $177,615 est. value
Broken Arrow, OK 74011

Last Updated 04/28/2022 08:44 AM
Project Title

Repair Kitchen Electrical System B713

Physical Address View project details and contacts
City, State (County) Enid, OK 73703   (Garfield County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install new Circuit breakers in Main Distribution Panel (MDP) to feed 4 new 42 circuit 208v panel boards. Two panel boards will be installed in the first-floor linen room. Two panel boards will be installed in the second-floor linen room. Run power to each room for a new electrical range. Install new microwave/ductless range hoods in each room. Additional details are described: Install 4 new circuit breakers in the MDP. Install 4 new panel boards, two downstairs and two upstairs in the linen rooms. Install conduit and conductors from the MDP to each of the 4 panel boards. Install conduit and conductors from panel board to every room for range & microwave receptacle. Install new range receptacle and appurtenances in 40 rooms. Provide and install new electric ranges in 40 rooms. Install new receptacle in upper cabinet for microwave/ ductless range hood. Provide and install new microwave/ductless range hoods in 40 rooms.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents