Similar Projects
MCSO Jail - Cast Iron Replacement
Bidding
$337,500 est. value
Ocala, FL 34475

Commercial Plumbing and Related Services
Bidding
Miami, FL

Plumbing, Service, Repair, and Maintenance
Post-Bid
Saint Petersburg, FL 33713

Plumbing Services
Term Contract
Post-Bid
Orlando, FL 32809

On-Call Plumbing/Sewer and Drain Services
Results
Tallahassee, FL 32312

Job Order Contracting - Plumbing Contractors
Term Contract
Results
Less than $200,000 est. value
Gainesville, FL

Plumbing Services
Bidding
Orlando, FL

Continuing Plumbing Contracting Services at the Orlando International Airport, Orlando Executive Airport
Post-Bid
Orlando, FL 32827

Plumbing Services
Term Contract
Results
Saint Augustine, FL 32084

Brent Fire Station Shower Replacement
Bidding
FL

South Martin Regional Utility Wastewater Treatment Plant Mag-Meter Replacement Project
Post-Bid
Hobe Sound, FL 33455

Plumbing Services, Time and Material, Maintenance and Repair
Term Contract
Results
Less than $420,000 est. value
West Palm Beach, FL 33415

Plumbing Contract Services
Term Contract
Bidding
FL

Plumbing Maintenance and Repair Services at Police Facilities
Post-Bid
Miami, FL 33133

Plumbing Services
Results
Miami, FL 33155

Last Updated 03/19/2021 12:50 PM
Project Title

City Hall Roof Drain Plumbing

Physical Address View project details and contacts
City, State (County) Gainesville, FL 32601   (Alachua County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Gainesville is looking to replace all of the existing horizontal cast iron roof drain piping above the ceiling of the Fourth Floor in the City Hall Building. This piping leads from the 16 roof drains (4 groups of 4 drains each) to the existing 4 main vertical leaders on the interior of the building that take the water to the ground level storm sewer. The existing horizontal piping consists of 3", 4", and 6" cast iron lines that will be replaced with Schedule 80 PVC of like sizing/capacity. This piping will turn-up and connect to existing roof drain locations and to the 4 main vertical leaders that will remain. The existing and new horizontal piping runs are above occupied office spaces of the building's Fourth Floor. At the conclusion of the work repair or replace all damaged items and existing conditions, if any. The Roofing Contractor, under subsequent separate contract, will install new 3” and 4” roof drains in the same locations as existing drains and connect to the new PVC outflow

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents