Similar Projects
Air Conditioning and Quality Improvements Package 5 - 2022 Bond - Lansing School
Alteration
Design
$4,100,000 est. value
Lansing, MI 48933

Replace Chiller Plant Phase 2 (Construction) at the Oscar G. Johnson VA Medical Center Iron Mountain
Renovation
Sub-Bidding
$5,000,000 CJ est. value
Iron Mountain, MI 49801

Air Traffic Control Tower Chiller Replacement Project
Renovation
Sub-Bidding
$600,000 CJ est. value
Battle Creek, MI 49015

CBS HVAC Upgrade
Alteration
Post-Bid
Bay City, MI

MBMV 162418 Modernize DDC System
Term Contract
Post-Bid
Battle Creek, MI 49015

Installation of Needlepoint Ionization Units
Alteration
Results
Lincoln, MI 48742

HVAC Controls Systems
Alteration
Results
Lansing, MI

Pool Dehumidification AHU Replacement
Renovation
Pending Verification
$2,200,000 CJ est. value
Allegan, MI 49010

Mars Elementary HVAC Improvements
Renovation
Sub-Bidding
$400,000 CJ est. value
Berrien Springs, MI 49103

Energy Savings Performance Contract
Alteration
Post-Bid
Jonesville, MI 49250

Lessenger Early Childhood HVAC Renovations
Alteration
Results
Oak Park, MI

Replacement of Two (2) Boilers, HVAC System Controls, and Roof Top Unit (RTU) System at the Ironwood Memorial Building
Renovation
Sub-Bidding
$500,000 CJ est. value
Ironwood, MI 49938

RTU Replacements
Alteration
Post-Bid
Lansing, MI 48910

Health Department Rooftop Unit Replacements
Alteration
Results
MI

LISD Porter Center HVAC and Roof Improvements
Alteration
Post-Bid
Adrian, MI 49221

Last Updated 01/16/2023 01:32 PM
Project Title

South Elementary School 2023 Mechanical Upgrades

Physical Address View project details and contacts
City, State (County) Ithaca, MI 48847   (Gratiot County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will utilize separate prime contractors. All contracts for construction will be direct contracts with the Owner. Overall administration of the Project will be the responsibility of the Construction Management Firm, Wolgast Corporation. The Owner will award contracts on or about January 23, 2023, to separate prime contractors for separate bid divisions or combinations of bid divisions. All bids shall be submitted on the bid forms provided in the project specifications, filled in, and executed (copies of the bid forms are acceptable). Facsimile bids will not be accepted. All questions regarding the bidding procedures, design, and drawing/specification intent are to be directed to the Construction Manager on a Clarification Request Form (Section 00310), attention Dale Schwerin. All bidders must provide familial disclosure in compliance with MCL 380.1267 and attach this information to the bid. The bid shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the Owner or the employee of the bidder and any member of the board, intermediate school board, or board of directors or the superintendent of the school district, intermediate superintendent of the intermediate school district, or chief executive officer of the publicschool academy. The district shall not accept a bid that does not include this sworn and notarized disclosure statement. The Owner reserves the right to reject any or all proposals, accept a bid other than the low bid, and to waive informalities, irregularities, and/or errors in the bid proposals, which they feel to be in their own best interest.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents