Similar Projects
Last Updated | 10/24/2022 12:52 AM |
Project Title | RFQ Design - Steven M. Clouse WRC Biosolids System Upgrades |
Physical Address | View project details and contacts |
City, State (County) | San Antonio, TX 78205 (Bexar County) |
Category(s) | Professional Services |
Sub-Category(s) | Architectural, Engineering |
Contracting Method | Competitive Bids |
Project Status | Request for Qualifications, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $50,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The San Antonio Water System (SAWS) is pursuing Requests for Qualifications (RFQ) for professional engineering services for the Steven M. Clouse WRC Biosolids System Upgrades Project ("Project"). Statements of Qualifications (SOQs) from interested firms (Respondents) are being accepted in connection with this Project, which will require the scope of services to be performed by a qualified professional engineering firm. The selected firm shall provide engineering services entailing planning, engineering evaluations, studies, reports, preliminary engineering, design, permitting, field investigations, constructability review, cost estimating, scheduling, bid, construction, start- up/commissioning, and overall project management and coordination services for the design and construction of the Project. October 14, 2022, by 4:00 p.m................................................................... Receipt of Written Questions Due Questions Please contact Roxanne Lockhart at 210-233-3095 November 2022....................................................................................................... Interviews, if necessary January 2023................................................................................... SAWS Board Consideration and Award January 2023................................................................................................. Non-Selection Notices mailed January 2023............................................................................................................................. Start Work The method of Contractor Selection has not been Determined at this time |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |