Similar Projects
PKAA, BPMD Campground 7 Project
New Construction
Bidding
Denver, CO

Mowing and Landscaping
Post-Bid
Boulder, CO

Morgan Hill Filing 1 Landscaping (District Improvement Areas)
Post-Bid
Boulder, CO

PKAA, Ben Butler Project
Results
Less than $84,865 est. value
Denver, CO

Ski Slope Fire Mitigation
Results
Colorado Springs, CO

Sweetgrass Filing 4 and Sweetgrass Parkway Landscaping
Post-Bid
CO

Pmaa, 5612, Granada Swa - Irrigation Center Pivot (C20se1)
Results
Less than $125,000 est. value
Colorado Springs, CO

Porteos, Powhaton Road And E. 56Th Avenue - Phase 2 Landscaping
Post-Bid
Greenwood Village, CO

Herbicides Purchase 2020 Road and Bridge Department
Results
Less than $38,807 est. value
Steamboat Springs, CO 80487

Porteos, Groot - Phase 3 Landscaping
Post-Bid
Greenwood Village, CO

Tree Removal and Stump Grinding Services
Results
CO

Interior and Exterior Floral Container Maintenance
Post-Bid
Lone Tree, CO

2020 Parkway Landscape Conversion Demonstration Project
Results
$30,000 to $50,000 est. value
Highlands Ranch, CO 80129

Exterior Floral Bed Design And Maintenance
Post-Bid
Lone Tree, CO

San Juan National Forest, Dolores Ranger District, Rmri Lower Glade Thinning.
Results
Dolores, Dunton, CO 81323

Reported 06/15/2021 12:00 AM
Project Title

Cameron Peak Fire Mitigation Construction Work

Physical Address View project details and contacts
City, State (County) Greeley, CO   (Weld County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Hand mulching Hillslope stabilizations such as waddles, tree welling, etc. Sedimentation basins Erosion Control measures Stream Channel Stabilization Seeding, Revegetation, Reforestation Debris removal Flooding prevention structures

Details

Division 10 - Specialties, Exterior Protection, Flood Barriers.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Retention Measures for Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 44 - Pollution and Waste Control Equipment, Solid Waste Collection, Transfer, and Hauling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents