Similar Projects
Rainbow Boulevard Improvements Project
Infrastructure
Bidding

Senior Center ADA Parking Lot Improvements
Post-Bid
Farmington, NM

Base Course Fill
Post-Bid

Foothills Drive Enhancement - Phase I
Results
Farmington, NM

Roadway Rehabilitation, Roadway Reconstruction
Results
NM

Aztec North Main Corridor Extension Construction Services
Post-Bid
Aztec, NM

Camino Coyote Lane
Results
$701,403 est. value

N101(1)2 4 Road Improvement
Infrastructure
Post-Bid
Ojo Amarillo, NM

Foothills Drive Enhancement Phase II
Results
$143,296,785 est. value
Farmington, NM 87402

Construct N36 Safety Project
Infrastructure
Post-Bid
NM

Crafco Crack Sealant
Results
Farmington, NM

N5012(1)1,2 and 4 Road Improvement Project
Infrastructure
Post-Bid
Sanostee, NM

Rehabilitate Runway 5/23 Project
Infrastructure
Results
Less than $5,500,000 est. value
Farmington, NM

Pavement Rehabilitation and Restriping Various Streets
Infrastructure
Post-Bid
Bloomfield, NM 87413

Crafco Crack Sealant - Multi-Term Contract
Term Contract, Infrastructure
Results
Less than $50,000 est. value
Farmington, NM

Last Updated 12/01/2021 12:24 PM
Project Title

North Trail Extension

Physical Address View project details and contacts
City, State (County) Farmington, NM   (San Juan County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed is the complete construction of new, natural surface, non-motorized bike and pedestrian path. The total length of the project is approximately 13,066 feet, and includes the creation and grading of a 12-15 foot-wide trail along this entire length. The path surface will be finished with 4-inch-thick road base that would be topped with a 2-inch-thick layer of gray crusher fines. Redi-rock retaining walls will be used below the Ordinary High Water Mark (OHWM) of the Animas River to retain the trail and prevent bank erosion in the reach identified in the “Construction Plans for Animas River Trail North Extension”. The trail extension will also include creating a pedestrian walkway under the Browning Parkway Bridge where approximately 180 feet of concrete pathway would be constructed. Concrete would be cast in place and a gabion retaining wall would be built at this location to prevent erosion during high flow events. Three prefabricated bridges would be installed over irrigation ditches and waterways in the project area. Total disturbance would be approximately 4.5 acres; 4.446 acres of permanent impacts to uplands, .02 acre of permanent impact to a forested wetland, and .034 acre of permanent impact to the Animas River. A check dam will be constructed for work below the OHWM and will result in 0.08 acre of temporary impact to the Animas River.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents