Similar Projects
Lewis East Substation Rebuild
Results
$2,213,470 est. value
Mesa, AZ 85201

KOFA Dome Tap Transmission Line Project
Post-Bid
$1,000,000 to $2,500,000 est. value
AZ

Material for a 345Kv Breaker Rebuild w/Erection Engineering Services
Results
Page, AZ

Pinnacle Peak Substation Bypass Breakers FY2020
Post-Bid
Phoenix, AZ

Pinnacle Peak Substation Shunt Capacitor Bank Replacement
Results
$750,000 to $1,500,000 est. value
Phoenix, AZ 85054

APS Evan Churchill Substation
New Construction - 15,268 SF
Construction
$3,000,000 est. value
Phoenix, AZ 85006

Traction Power Substation (TPSS) Batteries
Term Contract
Results
Phoenix, AZ

CMAR Bridges Elementary Addition
Addition - 9,300 SF
Post-Bid
$2,900,000 est. value
Gilbert, AZ 85298

Last Updated 01/06/2020 04:19 PM
Project Title

Substation Medium Voltage Transformer

Physical Address View project details and contacts
City, State (County) Parker, AZ 85344   (La Paz County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Set Aside for Indian Small Business Economic Enterprises. The Bureau of Indian Affairs, Colorado River Agency, Branch of Electrical Services (CRA-ES) requires maintenance, repair and thermal modifications to medium voltage electrical substation transformers. The contactor shall perform all necessary maintenance and repairs to as stated in this Statement of Work (SOW). Maintenance, repair and modification tasks shall include oil filtration, resealing/re-gasketing,, gauge replacement, bushing repair and/or replacement or repair of damaged cellulosic insulation, oil replenishment, testing, and thermal upgrades. All replacement materials and items shall be new Commercial-Off-the-Shelf (COTS) products. If custom/proprietary products are suggested or required, the contractor shall provide justification to the Contracting Officer (CO) and a courtesy copy sent to the Contracting Officers Representative (COR) at CRA-ES. Acceptance shall be required by the CO prior to any design or implementation. The RPMXC shall cover all repair and maintenance of existing Substation Transformers. CRA-ES shall be responsible for Lock Out Tag Out (LOTO) Procedures and Transformer/Substation isolation. CRA-ES shall not apply electrical phase to ground bonds (i.e. Grounds) for the Contractor. CRA-ES shall only open the appropriate circuit switches and breakers as to prevent the flow of energy. Contractors are encouraged to place their own grounds and locks on key points of isolation after CRA-ES has performed all isolation procedures. Contractor shall be responsible to place all their own grounds for personnel protection. Contractor shall also be responsible for removing all their own protective grounds before Transformer/Substation is re-energized.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents