Similar Projects
Interchange Reconstruction
Infrastructure
Conception
$44,458,000 est. value
Sioux Falls, SD 57109

Shoulder Widening, Replace Str RCBC, Approach Grading, Modify Intersection, Pipe Work; Signal
Infrastructure
Conception
$14,851,000 est. value
Frederick, SD

Mill, AC Resurfacing, Pipe Work
Infrastructure
Design
$5,522,000 CJ est. value
Willow Lake, SD 57278

Mill, AC Resurfacing, Pipe Work
Infrastructure
Design
$5,522,000 CJ est. value
Willow Lake, SD 57278

Rumble Stripes and High Grade Polymer Pave
Infrastructure
Bidding
$424,000 CJ est. value
Mitchell, SD 57301

Rumble Stripes and High Grade Polymer Pave
Infrastructure
Bidding
$424,000 CJ est. value
Mitchell, SD 57301

Harrisburg Schools 3rd Addition Mass Grading - South Cliff Avenue and East 85th Street
Infrastructure
Post-Bid
Sioux Falls, SD 57109

Alley Improvements - McGregor Street to Elm Street
Infrastructure
Post-Bid
Hill City, SD 57745

Saint Patrick Street Reconstruction
Results
$955,000 est. value
Rapid City, SD 57701

Phillips Avenue Improvements - 14th Street to 18th Street
Results
$1,327,780 est. value
Sioux Falls, SD

Village at Harmony Park
New Construction, Renovation, Infrastructure
Construction
Watertown, SD 57201

Bond New Elementary School - Vermillion School District 13-1
Demolition, New Construction, Renovation, Infrastructure
Construction
$26,000,000 CJ est. value
Vermillion, SD 57069

McMahon Subdivision Apartment Complex
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Rapid City, SD 57701

Skyline Pines East Subdivision
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Rapid City, SD 57701

Grading, AC Surfacing, Replace Str Bridge
Infrastructure
Conception
$12,849,000 est. value
Hill City, SD 57745

Last Updated 09/09/2022 03:03 PM
Project Title

RFP Engineering - Architectural and Engineering Services University of South Dakota (USD) Parking Lots 14 and 15 Improvement

Physical Address View project details and contacts
City, State (County) Vermillion, SD 57069   (Clay County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected January 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 9, 2022, information regarding award and award date has not been disclosed. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: The University of South Dakota, is soliciting Statements of Interest from firms interested in providing professional architectural and engineering services for the project referenced above. The project scope will involve the design, bid, and construction for Parking Lots 14 & 15 Improvements, at the University of South Dakota, Vermillion, SD. The project will include demolition and reconstruction of parking lots 14 & 15, south of the Fine Arts Building, on University Street. The project will include new utilities, earthwork, paving, curb and gutter, sidewalks, lighting, striping, and signage. The construction budget for the project is $900,000 but be advised this number is subject to change. The method of contractor selection has not been determined at this time.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents