Similar Projects
Jeffrey Park - Phase 9
New Construction - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Columbus, OH 43227

Rickenbacker Industrial Building I & II
New Construction - 5,700,000 SF
Conception
Lockbourne, OH 43137

Bridge Park - Block F Podium Apartment Building
New Construction - 214,000 SF
Design
$10,000,000 CJ est. value
Dublin, OH 43017

Golden Bear Redevelopment
New Construction, Build-Out - 250,847 SF
Design
$56,000,000 est. value
Upper Arlington, OH 43221

Airside 5
New Construction - 132,222 SF
Sub-Bidding
Columbus, OH 43219

Taylor Road Commercial Park
New Construction - 260,800 SF
Post-Bid
$6,600,000 est. value
Gahanna, OH 43004

Lincoln Tower Office Renovations
Renovation
Post-Bid
Less than $1,322,787 est. value
Columbus, OH

Tussing Place Rental Office
Addition
Results
Less than $100,000 est. value
Reynoldsburg, OH 43068

Alum Creek South Park TJ Knox Equipment Storage Building
New Construction - 945 SF
Results
Less than $133,500 est. value
Westerville, OH 43081

Arlington Gateway
New Construction, Renovation - 471,705 SF
Construction
$100,000,000 est. value
Upper Arlington, OH 43221

North Fourth Street Building
New Construction, Renovation
Construction
Columbus, OH 43085

Pathways to Independence of Central Ohio - Dog & Cat Daycare Center & Vocational Instruction
Renovation - 15,000 SF
Pending Verification
Worthington, OH 43229

The Motor Enclave
New Construction - 188,615 SF
Conception
$30,000,000 est. value
New Albany, OH 43054

Front & Fulton
Renovation - 172,310 SF
Design
Columbus, OH 43215

Discovery Self Storage
New Construction - 102,770 SF
Post-Bid
$7,000,000 est. value
Gahanna, OH 43230

Reported 04/01/2022 10:31 AM
Project Title

ADB Safegate North American Headquarters

Physical Address View project details and contacts
City, State (County) Gahanna, OH 43230   (Franklin County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Warehouse/Storage
Contracting Method
Project Status Construction Commenced first quarter 2022
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

349,760 SF - Office, 49,960 SF New Construction, Industrial Warehouse, 175,000 SF New Construction, Warehouse/Storage, 124,800 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents