Similar Projects
District Asphalt Work
Bidding
Layton, UT

I-15, 2600 South to Pages Ln (NB) Preservation High Volume
Bidding
$3,000,000 to $4,000,000 est. value
UT

Weber State Davis Campus Access Road
Post-Bid
Layton, UT 84041

Lot 4 at Hill AFB into a Fenced Material Storage Area.
Post-Bid
$5,000,000 to $10,000,000 est. value
UT

DDHU Lot 3 Repairs at Hill AFB, UT
Results
$5,000,000 to $10,000,000 est. value
Ogden, UT 84056

1300 North and 1000 West Roundabout Project
Results
$350,000 to $400,000 est. value
Clinton, UT 84015

Construction of the 400 East (Chase Lane to Parrish Lane) - Street Rebuild
Bidding
$450,000 est. value
Centerville, UT

Continental Drive Reconstruction Project
Post-Bid
Less than $690,000 est. value
Farmington, UT 84025

300 North Road Improvement Project
Results
Less than $1,600,000 est. value
West Point, UT 84015

DFCM Construction - Pre Qualified Paving - Davis Technical College Drive Paving Project
Bidding
$480,000 est. value
Kaysville, UT

Construction of the 2020 Road Improvement Project
Post-Bid
Syracuse, UT 84075

Bluff Road; 550 West (on Gentile) to 1000 West Reconstruct and Widening
Results
$3,000,000 to $6,000,000 est. value
UT

1970 South 1200 West Street Construction Project
Bidding
Woods Cross, UT 84087

800 North Roadway Improvements 450 West to 50 West
Post-Bid
$1,736,000 est. value
Clearfield, Sunset, UT

Construction of the 2020 Chip Seal
Term Contract
Results
Less than $440,000 est. value
Kaysville, UT 84037

Last Updated 03/10/2020 07:17 PM
Project Title

2020 Street Maintenance Projects

Physical Address View project details and contacts
City, State (County) Fruit Heights, UT 84037   (Davis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $111,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of approx. 30,000 total square yards of chip seal and then a fog seal on various roadways throughout the city. This project also includes traffic striping according to the striping plan found in the drawings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents