Similar Projects
Downtown Stormwater Treatment Phase 4 - STRH02 - City of Bozeman
Renovation
Conception
$250,000 CJ est. value
Bozeman, MT 59715

Downtown Stormwater Treatment Phase 3 - STRH01 - City of Bozeman
Renovation
Conception
$300,000 CJ est. value
Bozeman, MT 59715

Gardiner 2023 Wastewater Improvements
Renovation, Infrastructure
Bidding
$800,000 CJ est. value
Gardiner, MT 59030

Crow Water Treatment Plant Repairs
Infrastructure
Bidding
$250,000 CJ est. value
Crow Agency, MT 59022

Town of Wibaux Wastewater Treatment System Upgrades Project
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Wibaux, MT 59353

Simms Wastewater Treatment System Improvements - Phase II
Infrastructure, Renovation
Post-Bid
$330,000 CJ est. value
Simms, MT 59477

Water Reclamation Facility Heat Exchangers
Renovation
Results
Billings, MT

Water Reclamation Facility Primary Digester Cleaning and Improvements
Renovation
Results
Billings, MT

Mechanical Separation Units - Downtown Stormwater Treatment Phase 2 - STRM39 - City of Bozeman
Renovation
Conception
$300,000 CJ est. value
Bozeman, MT 59715

Philipsburg Wastewater Treatment System Improvements Equipment
Renovation, Infrastructure
Post-Bid
$965,000 CJ est. value
Philipsburg, MT 59858

Buena Vista Community Phase 2 Wastewater System Improvements
Renovation
Results
$580,000 est. value
Missoula, MT

Resurface and Repaint Clarifiers - WW39 - City of Bozeman
Renovation
Conception
$320,000 CJ est. value
Bozeman, MT 59718

RFQ Design - Kalispell Wastewater Treatment Plant Equalization Basin Project
Renovation
Post-Bid
$300,000 CJ est. value
Kalispell, MT 59901

Wilsall Water District Water System Improvements
New Construction, Renovation, Infrastructure
Results
$4,280,000 CJ est. value
Wilsall, MT 59086

Kay Beller Park to BNSF Loop Trail - City of Whitefish
New Construction, Infrastructure, Renovation
Conception
$2,100,000 CJ est. value
Whitefish, MT 59937

Last Updated 02/26/2023 02:31 AM
Project Title

Town of Terry Wastewater Treatment System Upgrades

Physical Address View project details and contacts
City, State (County) Terry, MT 59349   (Prairie County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $4,523,906 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The bid opening date and time is now February 9, 2023 at 3:00 pm local time. Sludge removal (including sludge dewatering) from the existing facultative lagoon cells. Ship to the project site all materials and accessories furnished under this contract and unload in the designated staging area. Contact Core Engineering Solutions, PLLC for exact location of the staging area prior to delivery of materials Bid Schedule Rehabilitation/expansion of the twocell facultative lagoon treatment system along with construction of a new UV disinfection system. Ship to the project site all materials and accessories furnished under this contract and unload in the designated staging area. Contact Core Engineering Solutions, PLLC for exact location of the staging area prior to delivery of materials. CONTRACTOR, including any of the CONTRACTOR'S subcontractors bidding or doing work on this project will be required to be registered with the Montana Department of Labor and Industry (DLI). Forms for registration are available from the Department of Labor and Industry, P.O. Box 8011, 1805 Prospect, Helena, Montana 59604-8011. Information on registration can be obtained by calling 1-406-444-7734. All laborers and mechanics employed by CONTRACTOR or subcontractors in performance of the construction work shall be paid wages at rates as may be required by the laws of the State of Montana and the agencies funding the project. The CONTRACTOR must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to the Town of Terry, in an amount not less than ten percent (10%) of the total amount of the bid. The successful BIDDER(S) shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance as required by the State of Montana and all funding agencies shall be provided by the successful BIDDER(S) and a certificate(s) of that insurance shall be provided. All questions regarding this project should be directed to Core Engineering Solutions at (406) 250-4852. In accordance with Article 2.01 (Instructions to Bidders) The right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid which is in the best interest of the OWNER.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents