Similar Projects
Provide RMHU Sewage Pump Station at Marcy CF
Renovation
Bidding
$50,000 to $2,000,000 est. value
Marcy, NY 13403

Variable Speed Pump Station Replacement
Renovation
Bidding
Warwick, NY 10990

Cumberland Avenue Pump Station CSO Upgrades
Post-Bid
Plattsburgh, NY 12901

Wastewater Pump Station Improvements
Post-Bid
Poughkeepsie, NY 12602

CM Services - Riverfront Pump Station
Term Contract
Results
Albany, NY 12242

Tarbell Hill Pump Station Improvements
Term Contract
Results
Port Henry, NY 12974

WPCP Low Lift Pump Improvements
Post-Bid
Poughkeepsie, NY 12601

Fourth Street Sewage Pump Station Improvements
Results
Buchanan, NY 10511

One (1) Wastewater Influent Comminutor at River Terrace Pump Station
Post-Bid
Endicott, NY 13760

Water Chemical System Improvements
Results
Less than $1,500,000 est. value
Buffalo, NY

Snowmaking Prefabricated Pump Station
Post-Bid
NY

Sanitary Pump Station Replacement -Evangola State Park
Results
Less than $200,000 est. value
Irving, NY 14081

Stardust Pump Station
Post-Bid
Olean, NY 14760

GC Phase 2 Water Supply, Contract 3: New Water Pump Stations
Term Contract
Results
Batavia, NY 14020

Emerson Park Sewer Station Repair
Post-Bid
Auburn, NY 13021

Reported 06/24/2020 12:00 AM
Project Title

Harriman Farms Pump Station Replacement

Physical Address View project details and contacts
City, State (County) Harriman, NY 10926   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall remove existing steel, five (5) foot diameter, thirteen (13) feet deep lift station, along with all associated pumps, piping, controls, wiring, conduit and any concrete ballast. 1. Cut and cap existing three (3) inch force main and six (6) inch gravity main and preparation of such mains for reconnection to new packaged lift station. 2. Removal of existing single phase electrical and phone utilities back to nearest junction box or pole for reconnection to new packaged lift station. 3. Provide bypass pumping or sewage storage for the duration of this Pump Station Replacement Project (“Project”). 4. Coordinate all excavation with all underground electric, plumbing and data utilities. 5. Provide proper shoring and dewatering of excavation site Contractor shall provide and install a new five (5) foot diameter, twelve (12) feet deep, fiberglass packaged duplex lift station with integrated dry valve chamber as manufactured by Excel fluid groups model EX-FGSA4PVD60X144IVSGV, or approved equal, including all pumps, piping, controls, wiring and related appurtenance, for a complete operating lift station. 1. Perform a detailed site investigation to confirm existing inverts and measurements in the field. 2. Lift station shall have two (2) recessed impeller flow through pumps, each capable of pumping forty (40) GPM at eighteen (18) feet of head pressure, three (3) phase, 208-230 volts 3. Lift station shall have duplex controls with VFD controls, two (2) mechanical float switches, a level transducer with stilling tube and a sensaphone model 1800 auto dialer. Control panel shall be a weather tight lockable panel and provided with a single duplex 20-amp service outlet. 4. Furnish and install one (1) new exterior grade double throw disconnect switch with appropriate backup generator plug. 5. Lift station shall be provided with a lifting crane. 6. Provide the necessary ballast for new lift station. 7. Connect new lift station to existing three (3) inch force main, six (6) inch gravity main, data and electrical utilities. 8. Backfill new lift station according to manufacturer recommendations. 9. Provide new four (4) inch thick 8’ x 10’ concrete pad surrounding new pump station. Pad shall be trawled smooth with a pitch to towards pump station. Pad shall be constructed with the proper steel reinforcement. 10. Provide a molded one-piece fiberglass enclosure to cover the pump station, which shall be securely mounted to the concrete pad. Enclosure shall be 6’ x 10’, have double entry doors, interior LED lights, single duplex service outlet and six (6) inch air intake vent as manufactured by FS Industries or approved equal. 11. Return surrounding construction area to original condition including all fencing, curbing, asphalt, shrubs, retaining walls and grass areas.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents