Similar Projects
Pre-Event Generator Installation
Bidding

Testing and Repair of Hydroelectric Generator Governor Systems at Hydroelectric Facilities for the U.S. Army Corps of Engineers
Post-Bid

Strobe/Led Lights: Flat and Pipe Mount
Term Contract
Post-Bid

Electrical Services and Repairs
Term Contract
Results
Casselberry, FL 32707

Building J Switchgear Project
Results
Less than $121,562 est. value
Sanford, FL 32771

Grid-Tied Solar Photovoltaic System at the Robert and Jane Lee Campus
Results
Oviedo, FL 32773

Lake Mary Boulevard Lift Station Generator and Electrical Improvements
Results
Less than $90,000 est. value
Lake Mary, FL 32746

Term Contract for Generator Services and Repairs
Term Contract
Results
Sanford, FL 32771

Term Contract for Electrical Contractor Services
Term Contract
Results
Sanford, FL 32771

Term Contract for the Maintenance, Repairs and Replacements of Uninterruptible Power System (UPS) throughout Seminole County
Term Contract
Results
Sanford, FL 32771

Replacement of Two (2) Diesel Generators at the County Public Safety Building
Term Contract
Results
Sanford, FL 32773

UPS System Replacement for Criminal Justice Center Building and Oviedo Facility
Results
Sanford, FL 32773

Generator Maintenance Services - Annual Requirements
Term Contract
Results
Less than $100,000 est. value
Altamonte Springs, FL 32701

Lift Station Emergency Power Generator Installation – Phase III
Results
Less than $475,000 est. value
Apopka, Lake Mary, Winter Park, FL 32746

Solar Array Electrical Connection
Results
Less than $325,000 est. value
Altamonte Springs, FL 32714

Last Updated 02/12/2020 10:54 AM
Project Title

Design, Provide and Install Floating Photovoltaic Solar Array (1.0 Megawatt)

Physical Address View project details and contacts
City, State (County) Altamonte Springs, FL   (Seminole County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The selected firm shall design, permit, furnish, and install a 1.0 megawatt grid-connected floating solar array on an existing stormwater detention pond adjacent to the Altamonte Springs Regional Water Reclamation Facility (RWRF). The stormwater detention pond is located northwest of the RWRF.

Details

Division 26 - Electrical.
Division 48 - Electrical Power Generation, Solar Energy Electrical Power Generation Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents