Similar Projects
Winery and Patio
New Construction, Infrastructure - 4,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Rosemount, MN 55068

Tap Society Restaurant
New Construction, Infrastructure - 3,500 SF
Conception
$500,000 to $1,000,000 CJ est. value
Rosemount, MN 55068

River's Edge Development
New Construction, Infrastructure
Design
Farmington, MN

River's Edge Development
New Construction, Infrastructure
Design
Farmington, MN

Bituminous Mill and Surfacing
Infrastructure
Bidding
MN

Century Middle School Pool Addition - Bid Package 4 - Parking Lot
Post-Bid
Lakeville, MN 55044

2021 Crack Sealing and Seal Coating
Post-Bid
MN

CSAH 42/Akron Avenue Intersection Improvements
Results
Less than $2,700,000 est. value
Hastings, MN 55033

Grading, Bituminous Mill and Overlay
Results

Vita Attiva Development Expansion
New Construction, Infrastructure
Construction
Farmington, MN

Vita Attiva Development Expansion
New Construction, Infrastructure
Construction
Farmington, MN

Gateway Housing
New Construction, Infrastructure - 75,899 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Burnsville, MN

Fairhill Estate at North Creek Addition
New Construction, Infrastructure
Pending Verification
Farmington, MN

Amber Fields Development
New Construction, Infrastructure - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Rosemount, MN

Highlands at Settlers Ridge Residential Development
New Construction, Infrastructure
Design
Inver Grove Heights, MN

Last Updated 10/25/2021 10:11 AM
Project Title

LHRP Campground Entrance Road

Physical Address View project details and contacts
City, State (County) Apple Valley, MN 55124   (Dakota County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $575,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The bid package includes widening and straightening the curves at the campground entry road with mill and overlay, adding a pedestrian access from internal campground road to Johnny Cake, upgraded lighting and new bituminous at all RV Loop, ADA sites and pull-through site #58

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents