Similar Projects
Eagle Ridge Mixed Use Development
New Construction
Conception
North Castle, NY 10504

Apartment Complex
New Construction
Conception
Owego, NY 13827

Kingston Meadows Senior Housing
New Construction - 65,145 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Kingston, NY 12401

Multi-Family and Commercial Mixed Use
Renovation - 10,940 SF
Design
$4,000,000 est. value
Poughkeepsie, NY 12601

Main Street Apartments
New Construction - 160,000 SF
Sub-Bidding
$51,000,000 est. value
Peekskill, NY 10566

Alexan Westchester
New Construction
Sub-Bidding
Harrison, NY 10604

The Village at Port Chester
New Construction - 90,000 SF
Post-Bid
$11,800,000 est. value
Port Chester, NY 10573

Park Place on the Peninsula
New Construction - 261,225 SF
Post-Bid
$24,000,000 est. value
Clifton Park, NY 12065

Development Partner for Multiple Complexes and Scattered Sites
Results
Rochester, NY 14605

Wampus Mills Senior Housing
New Construction - 39,987 SF
Construction
Armonk, NY 10504

Woodmont Hills
New Construction - 456,656 SF
Construction
Ramapo, NY 10974

Washington Street Apartment Conversion
Renovation
Pending Verification
Binghamton, NY 13901

North Depot Street Apartment Conversion
Renovation
Pending Verification
Binghamton, NY 13901

Broad Street Residences
New Construction
Conception
$42,300,000 est. value
Rochester, NY 14607

Fiddler's Green at Good Time Park
New Construction - 480,000 SF
Design
Goshen, NY 10924

Reported 09/11/2020 12:00 AM
Project Title

Downtown Grant Program - 55-59 Clinton Street Renovations

Physical Address View project details and contacts
City, State (County) Plattsburgh, NY 12901   (Clinton County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Exterior Renovations ā€“ LBP Identified. Install new double insulated low ā€˜Eā€™ windows Inspect all window heads / trims for damage, repair as needed Paint all window trim Paint all brick and wood trim Repair main entry door Replace existing wooden fire escape with new wooden fire escape on Protection Alley Interior Renovations Renovate 2nd Floor Apartment-2C and 3rd Floor Apartment-3E New Kitchen New Bathroom New Flooring Repair and replace existing doors Patch and paint all interior walls Upgrade electrical system as necessary Basement Inspect electrical, repair as needed.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents