Similar Projects
Village at Deer Run Phase 2
New Construction
Conception
Bartlett, TN 38134

Fort Sanders to Tyson Park Connection - City of Knoxville
Infrastructure, Alteration
Conception
$5,915,000 est. value
Knoxville, TN 37916

MTRO Essential Maintenance
Renovation, Infrastructure
Design
$3,400,000 CJ est. value
Nashville, TN 37214

Bottled Blonde / Nashville
New Construction, Infrastructure - 25,000 SF
Design
$20,000,000 CJ est. value
Nashville, TN 37201

Bridge Replacement Factory Creek Lane Over Factory Creek
Demolition, New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Waynesboro, TN 38485

Water Storage Tank Improvements
Infrastructure
Bidding
$400,000 CJ est. value
McMinnville, TN 37110

Shalom Farms Apartments - Phase 1
New Construction, Infrastructure - 180,000 SF
Sub-Bidding
$40,000,000 CJ est. value
Murfreesboro, TN 37128

Northview Baseball and Softball Fields
New Construction
Post-Bid
TN

Complete Site Prep 1st Fl. Bldg. 1A SPECT-CT
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Memphis, TN 38104

Gallatin Training Facility Mass Grading
Results
Gallatin, TN 37066

Housing Rehabilitation
Renovation
Results
Altamont, TN 37301

Villages of Porter Farms Phase 21
New Construction - 40,000 SF
Construction
Collierville, TN 38017

Whataburger - TN 109 / Lebanon
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Lebanon, TN 37090

Greeneville Planning Commission Approves Subdivision Plans
New Construction
Pending Verification
Greeneville, TN

Ridgeview Oaks
New Construction
Conception
$3,000,000 est. value
Columbia, TN 38401

Last Updated 09/09/2022 02:04 PM
Project Title

Saxony Phase IV

Physical Address View project details and contacts
City, State (County) Cookeville, TN 38501   (Putnam County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $52,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 132 lot residential subdivision. As of September 9, 2022, this project is in the early planning stages, and is seeking approvals from the City of Cookeville. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to first quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents