Similar Projects
Sidewalk Improvements - Stratford Drive from Westchester Drive to Britton Road
Infrastructure
Bidding
$400,000 est. value
The Village, OK

FY23 ADA Improvements
Infrastructure
Bidding
$400,000 est. value
Harrisburg, NC

Concrete Walking Trails - Cheyenne, High Spirits and Sequoyah Parks
Infrastructure
Post-Bid
Del City, OK 73115

Parking Lot Maintenance
Infrastructure
Post-Bid
OK 73104

Pedestrian Improvements (Trail and School Zone)
Results
Midwest City, OK 73130

Pedestrian Improvements (Sidewalks)
Infrastructure
Results
OK

2021 Bond Edmond Public Schools Parking Improvements
Infrastructure
Post-Bid
$4,750,000 est. value
Edmond, OK

MP-0487R and MP-0545 PH II Greenway Trail along the Oklahoma River and Wayfinding
Infrastructure
Results
OK 73117

Warr Acres Library - Parking Lot Resurfacing
Infrastructure
Post-Bid
$160,000 est. value
Warr Acres, OK 73132

Residential Sidewalk and Pavement Repair
Infrastructure
Results
$6,000,000 est. value
OK

Construction of Stephenson Park and 4th Street Streetscape
Infrastructure
Post-Bid
$2,000,000 est. value
Edmond, OK

Trail Improvement Lake Hefner Trail
Infrastructure
Results
$1,007,670 est. value
Oklahoma City, OK 73195

PH V - USA Softball Hall of Fame Trail
Infrastructure
Results
$1,600,000 est. value
Oklahoma City, OK

Library Sidewalk / 8143 E Reno
Infrastructure
Results
Midwest City, OK 73110

Pedestrian Improvements (Bike Lane and Striping) City Streets (OKC Watch 4 ME)
Infrastructure
Results
$1,811,822 est. value
Oklahoma City, OK

Last Updated 06/15/2022 08:12 AM
Project Title

Pedestrian Improvements (Trail Construction) Palmer Loop Trail Elementary School Connector

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73110   (Oklahoma County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $227,323 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pedestrian Improvements (Trail Construction) Palmer Loop Trail Elementary School Connector: From Midwest Boulevard, Extend East in the City of Midwest City. Project Length = 0.070 Mile

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents