Similar Projects
Cypress Lake United Methodist Church Multipurpose Facility
New Construction, Addition - 18,262 SF
Conception
$500,000 to $1,000,000 CJ est. value
Fort Myers, FL

Kensington Church Campus Master Plan
New Construction
Conception
Winter Garden, FL 34787

Harvest Tabernacle Church - Recreation Center
Addition - 13,004 SF
Design
$1,500,000 est. value
Sarasota, FL 34235

Kingdom Hall
New Construction - 3,793 SF
Design
$500,000 est. value
Lehigh Acres, FL 33971

Providence Baptist Church
New Construction - 2,406 SF
Bidding
$500,000 to $1,000,000 CJ est. value
Tallahassee, FL 32310

Stetson Baptist Church
Renovation - 30,325 SF
Sub-Bidding
Deland, FL 32720

Palm Coast United Methodist Church
New Construction - 25,495 SF
Post-Bid
$7,000,000 est. value
Palm Coast, FL 32137

Northstar Church
Renovation - 24,800 SF
Post-Bid
Panama City, FL

Pineywood Cemetery Columbarium
Results
Winter Park, FL 32792

First Baptist Church at Hillsboro
New Construction - 25,000 SF
Construction
$2,945,000 est. value
Coconut Creek, FL 33073

Church by the Sea
New Construction - 75,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Bay Harbor Islands, FL

Chapel Of Faith
New Construction - 5,944 SF
Pending Verification
Tampa, FL 33604

Hastings - Mixed-Use
New Construction - 20,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Sorrento, FL

Center For Jewish Life
New Construction
Conception
Miami, FL 33129

Islamic Center of Southwest Florida Expansion
New Construction - 15,224 SF
Design
$850,000 est. value
Fort Myers, FL 33901

Last Updated 02/24/2022 02:50 PM
Project Title

St. George Coptic Orthodox Church

Physical Address View project details and contacts
City, State (County) Daytona Beach, FL 32118   (Volusia County)
Category(s) Religious/Funeral
Sub-Category(s) Religious Facility
Contracting Method
Project Status Construction Commenced February 2021, Construction Complete as of January 2022
Bids Due View project details and contacts
Estimated Value $1,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Addition to include bell tower, expanded parking lot

Details

1 Religious Facility, 1,200 SF Addition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing, Glass Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Cement Plastering, Cement Stucco, Tiling, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Fire Protection Specialties.
Division 11 - Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting Preparation, Landscape Grading, Planting Accessories, Landscape Surfacing.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents