Similar Projects
High Head Pump Station/Low Head Pump Station MCC Replacement Project
Renovation
Bidding
Canon City, CO

Piney Creek Lift Station Upgrades
Renovation
Bidding
$2,500,000 to $2,700,000 est. value
Aurora, CO 80016

Water System Improvements
Post-Bid
Romeo, CO 81148

Murphy Creek Lift Station Wetwell Recoating
Post-Bid
Aurora, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Proposals Ashcroft Draw Lift Station
Results
Greeley, CO 80631

Glenview Owners` Association Booster Pump Station
Construction
Less than $420,000 est. value
Buena Vista, CO

Non - Potable Irrigation Pump Stations for Water and Sewer Department
New Construction
Bidding
Greeley, CO 80631

Milavec West Pump Station Screen and Filter Improvements
Post-Bid
Frederick, CO 80530

Lift Station Valve Assembly Construction
Results
Less than $122,000 est. value
Falcon, CO

South St. Vrain Creek Pipeline Pump Station Construction
Renovation
Bidding
Longmont, Lyons, CO 80540

ERWSD & UERWA Water Storage Tank and Booster Pump Stations Hatch Improvements
Post-Bid
Vail, CO

Tuscany Tract O Irrigation Pump Skid
Results
Evans, CO

Lift Station No. 1 Additions
Renovation
Bidding
CO

Zone 3/4 Pump Station MCC Replacement and VFD Install
Renovation
Post-Bid
Thornton, CO

Last Updated 12/23/2021 05:14 PM
Project Title

Bell Roth Irrigation Pumphouse Remodel 2021-2022

Physical Address View project details and contacts
City, State (County) Federal Heights, CO 80260   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: An existing pump house adjacent to the Complex Irrigation Lake will be remodeled and upgraded. Removal and demo of existing equipment is included. Removal and reinstallation of the pumphouse roof, if necessary, will be included. The existing pump skid will be removed and saved for owner. Any demo debris, except items saved for Owner, and all other construction debris will be disposed of by Contractor. Installation of the new pump equipment is detailed in the RM Pump Specs and Drawings. Included will be the underground connection of the discharge piping to an existing mainline and a main line which will be installed prior to pumphouse remodel. These connections will be in close proximity to the pump house, with exact locations to be determined.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents