Similar Projects
Reported | 10/21/2022 12:00 AM |
Project Title | RFQ Design - Ag Engineering - HVAC Upgrade |
Physical Address | View project details and contacts |
City, State (County) | Columbus, OH 43210 (Franklin County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids |
Project Status | Bidding, Accepting Qualifications, |
Bids Due | View project details and contacts |
Estimated Value | $1,747,310 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Submit all questions regarding this RFQ in writing to Chris Kuhn at Kuhn.750@osu.edu with the project number included in the subject line (no phone calls please). This project will replace and enhance the HVAC systems in rooms 145, 156, 158, 164, and 166 at The Ohio State University Agricultural Engineering Building (0298). These spaces total almost 17,000 GSF of high bay instructional spaces consisting of large farm implement repair, wood shop, welding shop, small engine repair shop, and equipment repair classrooms. These spaces are not currently air conditioned but are heated in the winter months and exhausted when operations are taking place within the space. The current HVAC system for these rooms consist of five (5) individual air handling units (AHU), located in the mezzanine area of rooms 144 and 147. The purpose of this project is to replace the five (5) existing AHUs and add cooling to these spaces. Project scope will also include hot/chilled water piping, fan variable frequency drivers (VFD), direct digital controls (DDC), roof penetrations, and electrical work for the new units. This project will be coordinated with the new Combined Heat and Power Plant (CHP) and the District Heating and Cooling (DHC) projects taking place on The Ohio State University Campus. By bringing hot and chilled water into the building, these separate projects that will enable the upgrades. Anticipated Schedule Professional Services Start 11 / 22 Construction Notice to Proceed 5 / 23 Substantial Completion of all Work 1 / 24 Professional Services Completed 12 / 24 |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |