Similar Projects
Flooring Contractors
Post-Bid
$25,000 to $100,000 est. value
Philadelphia, PA

GTI Tiles
Post-Bid
$25,000 to $100,000 est. value
Philadelphia, PA

Water Damage Mitigation Services
Results
Philadelphia, PA

Flooring NF 323182 Exit Yellow (ERV
Post-Bid
Philadelphia, PA

Bold Step Aluminum Safety Stair Treads
Post-Bid
Philadelphia, PA

B&B B8Th Street Step Treads
Post-Bid
Philadelphia, PA

Floor Mats
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

PATCO Station Floor Upgrades - Philadelphia
Post-Bid
Philadelphia, PA 19102

Broadloom Carpet, Carpet Tile And Installation
Post-Bid
Philadelphia, PA

Flooring Safety Applique Incom Css10268
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

Carpet Replacement for Hall F Concourse and Grand Ballroom A and B
Post-Bid
Philadelphia, PA

Floor Mat With Library Logo
Post-Bid
Philadelphia, PA

Replace Carpet in Congress Hall
Post-Bid
Philadelphia, PA 19106

Visions Floor Finish
Post-Bid
Philadelphia, PA 19102

S--SDVOSB Set-Aside Cove Base Replacement at Philadelphia VA Medical Center
Post-Bid
Philadelphia, PA 191044551

Last Updated 10/21/2019 04:01 PM
Project Title

Z--D/B Dishwasher Floor Replacement

Physical Address View project details and contacts
City, State (County) Philadelphia, PA   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Corporal Michael J. Crescenz Veterans Affairs Medical Center, Philadelphia, PA requires a design build project. This Design Build project consists of the Professional Design for the development of construction documents and Construction Services for the replacement of the kitchen floor including the dishwasher. The dishwasher will have to be replaced with a rental for the duration of the floor replacement phase of this project. Provide labor and material necessary to upgrade floor Building #2 main Kitchen located on ground floor.
Details
Division 09 - Finishes, Flooring.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents