Similar Projects
Doors and Locks Installation
Post-Bid
Nyack, NY 10960

On Call Window Repair and Door Glazing Repair
Term Contract
Post-Bid
Yonkers, NY

Z--Replace Visitor Center Windows
Results
$250,000 to $500,000 est. value
Stillwater, NY

LRB Building #3 Garage Door Replacement
Results
Less than $25,000 est. value
Buffalo, NY 142073199

Schenectady City Hall Window Restoration
Post-Bid
Schenectady, NY 12305

Hudson Valley Regional Airport Jet Center Door Rehabilitation
Results
Wappingers Falls, NY

Interior Storm Window Inserts
Post-Bid
Kingston, NY

Window Replacement and Related Work
Results
Spring Valley, NY 10977

Door Replacement at Pearls / Hawthorne School
Post-Bid
Yonkers, NY

Replace Windows Rockefeller Arts at SUNY Fredonia
Results
$1,000,000 to $2,500,000 est. value
Fredonia, NY

Fire Station Door Replacement
Renovation
Post-Bid
Ausable Forks, NY 12912

Overhead Door Purchase and Installation Services
Results
Ithaca, NY

ADA Handicap Doors and Exterior Renovations at Senior Center
Post-Bid
Greenwood Lake, NY 10925

Window Replacement including Hazardous Materials Abatement Nassau and Wayne Halls (Base Bid) and Suffolk Hall (Alternate 1)
Term Contract
Results
Geneseo, NY

Fleetwood Elementary School - Window Replacement and Related Work Summit Park Elementary School - Window Replacement and Related Work
Post-Bid
Spring Valley, NY 10977

Last Updated 08/09/2019 09:05 AM
Project Title

Village Office Window Replacement Project

Physical Address View project details and contacts
City, State (County) Green Island, NY   (Albany County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Scope to include the following Replacement of 47 existing windows with Harvey Majesty Double Hung (specification sheets provided) window units with bronze aluminum clad exterior, natural pine interior, low E glass with Argon gas, window locks, matching color half screens with charcoal mesh, 2" jamb depth and through jamb installation. Includes removal and proper disposal of all existing windows specified for replacement, furnish and install new units, breakmetal work at curved top openings, stain interior windows to match existing (owner to work with contractor on color) and appropriate colored perimeter caulking.
Details
Division 08 - Openings, Doors and Frames, Windows.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents