Similar Projects
Last Updated | 12/17/2019 09:55 AM |
Project Title | Greenboro Forcemain Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | West Melbourne, FL 32904 (Brevard County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $649,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work under this contract includes the following: 1. Installation of a new 12” HDPE forcemain by horizontal directional drilling and 12” PVC forcemain by open cut. 2. Routing of an existing 4” PVC forcemain to an existing sanitary sewer manhole. 3. Connection of the new forcemain to existing systems. 4. Abandonment, grouting, and/or removal of the existing 4” and 10” PVC forcemain. 5. Significant clearing and installation of slope stabilization (gabion baskets) at forcemain canal crossings (base bid) and along the north side of the Lakeside apartment complex (additive alternate #1). 6. Minor demolition and restoration. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |