Similar Projects
Park Place Bridgeport Mixed Use / Tualatin
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Bagan Park - 92067 - City Of Tigard
Infrastructure
Conception
$935,000 CJ est. value
Tigard, OR 97223

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

HiLight FTTP Construction Shute Park Phase 3 - Public Improvement ITB
Infrastructure
Bidding
$308,000 CJ est. value
Hillsboro, OR 97123

HiLight FTTP Construction Shute Park Phase 3 - Public Improvement ITB
Infrastructure
Bidding
$308,000 CJ est. value
Hillsboro, OR 97123

Dirksen Nature Park Trail and Parking Lot Improvements
Infrastructure
Post-Bid
Tigard, OR 97223

QSJ RCLR Road Repair
Infrastructure
Post-Bid
$125,000 to $145,000 est. value
Hillsboro, OR 97124

NW 174th Ave Sidewalk Infill - NW Santiam Dr to NW Sandpines Ln
Alteration
Results
$100,000 to $200,000 est. value
OR

ADA Ramps Fischer and Roshak Multiple Locations
Infrastructure
Results
$1,000,000 to $1,500,000 est. value
Hillsboro, OR

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Bull Mountain Road Water Pipeline - City Of Tigard
Infrastructure
Conception
$8,609,000 CJ est. value
Tigard, OR 97224

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

Pavement Maintenance, Installation, Repair and Concrete Grinding Services
Infrastructure
Post-Bid
Hillsboro, OR

Last Updated 12/06/2022 07:02 PM
Project Title

Hall Boulevard / Pfaffle Street New Traffic Signal - City Of Tigard

Physical Address View project details and contacts
City, State (County) Tigard, OR 97223   (Washington County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2026
Bids Due View project details and contacts
Estimated Value $950,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will construct a new traffic signal with appropriate illumination, crosswalks, and lengthening and separation of the turn lanes on Pfaftle Street. The project will be complicated by the proximity to the Hall Boulevard/Highway 217 Bridge and the fact that Hall Boulevard 1s an ODOT-controlled facility necessitating agency approval and permits. Completion of these improvements will increase safety for vehicles, pedestrians, and cyclists using the intersection or traveling to and from the nearby school, Pacific Highway, and Washington Square Regional Center. In FY 2020-21, Tigard will pay ODOT to design and construct a traffic signal footing along with conduit for future fiber optic cable installation. This project is within the limits of the Hall Boulevard overpass replacement that is part of ODOT's OR 217 (OR-10 to OR-99W)) project. As of December 6, 2022, this project is currently in the FY 2022-2023 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2026. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents