Similar Projects
Public Safety Building - PUBSF 24-01 - City of Waukee
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Waukee, IA 50263

Public Safety Building - PUBSF 24-01 - City of Waukee
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Waukee, IA 50263

10th Street & Sunrise Dr Phs II A Improvements
Infrastructure
Design
$13,300,000 CJ est. value
Waukee, IA 50263

10th Street & Sunrise Dr Phs II A Improvements
Infrastructure
Design
$13,300,000 CJ est. value
Waukee, IA 50263

New Concessions Building - General Construction , Mechanical and Electrical
New Construction, Renovation, Infrastructure
Post-Bid
$800,000 CJ est. value
Van Meter, IA 50261

RFQ Design - Satellite Maintenance Facility at 170th Street and Waterford Road
New Construction, Infrastructure
Post-Bid
$250,000 CJ est. value
Waukee, IA 50263

Eagle Vista Drive Pavement Rehabilitation
Infrastructure
Results
$148,770 est. value
Adel, IA 50003

PCC Patching
Infrastructure
Results

Dupaco Community Credit Union / Waukee
New Construction, Infrastructure - 6,400 SF
Pending Verification
$1,500,000 CJ est. value
Waukee, IA 50263

Fourth Street Park Building - City Of Waukee
New Construction, Infrastructure - 2,373 SF
Pending Verification
$18,736,000 CJ est. value
Waukee, IA 50263

Monroe Court Water Main: 70th to 72nd - WA08-01 - City of Urbandale
Infrastructure
Conception
$344,500 CJ est. value
Urbandale, IA 50323

Warrior Lane Improvements Phase 2
Infrastructure
Results
Waukee, IA 50263

Middle Level 6 - 2020 Bond - Waukee Community School District
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Waukee, IA 50263

Monroe Court Water Main: 72nd to Roseland - WA18-01 - City of Urbandale
Infrastructure
Conception
$424,000 CJ est. value
Urbandale, IA 50323

2020 Downtown Street and Utility Improvements
Infrastructure
Results
Perry, IA

Last Updated 05/15/2023 04:19 PM
Project Title

Raccoon River Valley Trail to High Trestle Trail Connector Phase V M Avenue To O Avenue Dallas County Conservation Board

Physical Address View project details and contacts
City, State (County) Bouton, IA 50039   (Dallas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,745,070 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes all materials, equipment, transportation, and labor necessary to complete the improvements. The proposed project includes 16,111 CY class 10 excavation, 17,760 SY special subgrade preparation for shared use path, 485.5 LF of storm sewer pipe (15 inch to 60 inch), 1 SW-512 intake, 1,141 SY of 8" PCC Pavement, 14,453 SY of 6" PCC shared use path, 865 SY of 6" PCC pavement for trail head parking lot, trail signage, traffic control, erosion control, surface restoration, and other miscellaneous work.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents