Similar Projects
SR 99/Lincoln Way Vic to Evergreen Way - ADA Compliance
Infrastructure
Design
$969,000 CJ est. value
Everett, WA 98208

SR 531/43rd Ave NE to 67th Ave NE - Widening
Infrastructure
Design
$29,204,000 CJ est. value
Marysville, WA 98271

Roster of Architectural and Engineering Firms
Infrastructure
Bidding
WA 98203

Architects, Engineers, and Professional Consultants
New Construction, Infrastructure
Bidding
Everett, WA

Darrington Compound Fence Install
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Darrington, WA 98241

Remove and Replace Some 4' Chain Link Fence With 8' Chain Link Fence
Infrastructure
Sub-Bidding
$90,000 CJ est. value
Sultan, WA 98294

Professional Engineering, Architectural And Land Surveying Services - Sultan School District
Renovation, Infrastructure, Alteration
Post-Bid
Sultan, WA 98294

Surveying and Mapping for Future Waterline Replacement Projects
Alteration
Post-Bid
Index, WA 98256

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Broadband Feasibility Study
Alteration
Bidding
Arlington, WA

Irrigation Design, SR 530 Slide Memorial
Alteration
Post-Bid
WA

Port Gardner Storage Facility
New Construction, Infrastructure
Results
Everett, WA 98213

SR 526/Airport Rd to E Casino Rd - Seismic Retrofit
Infrastructure, Renovation
Bidding
$7,000,000 CJ est. value
Everett, WA 98208

Capital Planning Consulting, Architectural, Engineering, Environmental, & Archaeology Services
Renovation, Term Contract
Post-Bid
Tulalip Bay, WA 98271

Last Updated 08/02/2022 12:32 PM
Project Title

RFQ Engineering - Replacement of Reservoir 3

Physical Address View project details and contacts
City, State (County) Everett, WA 98203   (Snohomish County)
Category(s) Heavy and Highway, Professional Services, Sewer and Water
Sub-Category(s) Engineering, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,750,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of Reservoir 3 The City of Everett (City) is requesting a Statement of Qualifications (SOQ) for engineering services related to the replacement of its Water Reservoir 3 located at 6107 Berkshire Drive west of Evergreen Way. The City conducted a seismic structural assessment on Reservoir 3 which indicated that the reservoir is not compliant with current codes and a large seismic event would cause structural failure of the reservoir. The 2020 Comprehensive Water Plan recommends replacement of the 100-year-old, 20 MG Reservoir 3 with new reservoir(s) to be located within or in the vicinity of the current Reservoir 3 site. The replacement is scheduled for 2024/2026 The consulting services work may include, but is not limited to, surveying and preparation of base maps, alternatives development and evaluation, geotechnical evaluation, environmental and construction permitting, design, evaluation of construction methods and scheduling, preparation of bid documents, public outreach support, support services during construction, and construction management. The City is considering utilizing a Project Labor Agreement/Community Workforce Agreement (PLA/CWA) for the construction of this project, and is seeking the consultant's perspective on the value and execution of this approach. Minimum Information Required: The firm's experience in the design of storage reservoirs of similar size The firm's experience with incorporating PLA/CWAs into bid documents The experience of the proposed project manager and individuals who will be working on the preparation of the plans and specifications Approach to managing and completing the project A draft schedule for the completion of the project (Design, Bidding and Construction) Approach to communicating with the City. Be specific about what is communicated and the form and frequency of your communications. The SOQ will be evaluated, and based on the results, the City will either enter directly into contract negotiations with the most qualified consultant or will interview as many as necessary before final selection is made. All communications regarding this project shall be directed only to Souheil Nasr, P.E. at (425) 257-7210 or snasr@everettwa.gov. Communicating with any other City employee on this project is not permitted and may be grounds for rejecting the consultant's SOQ. The method of Contractor Selection has not been Determined at this time.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents