Similar Projects
Kingdom Hall of Jehovah's Witnesses
New Construction, Infrastructure - 3,000 SF
Conception
$1,000,000 CJ est. value
Aurora, OH 44202

Cleveland Avenue (SR 532) Trunk Sewer - Construction - Summit County
Infrastructure
Conception
$1,700,000 CJ est. value
Mogadore, OH 44260

Roadway Minor Rehab - SR 43
Infrastructure
Design
$1,434,000 CJ est. value
Kent, OH 44240

Roadway Minor Rehab - SR 43
Infrastructure
Design
$1,434,000 CJ est. value
Kent, OH 44240

Two Lane Resurfacing - SR 88
Infrastructure
Bidding
$1,050,000 CJ est. value
Garrettsville, OH 44231

Two Lane Resurfacing - SR 88
Infrastructure
Bidding
$1,050,000 CJ est. value
Garrettsville, OH 44231

Kent State University Airport Runway Design Study
Infrastructure
Post-Bid
$160,000 CJ est. value
Stow, OH 44224

Kent State University Airport Runway Design Study
Infrastructure
Post-Bid
$160,000 CJ est. value
Stow, OH 44224

Intersection - SUM-Wooster Road Robinson
Infrastructure
Results
$1,248,937 est. value

2022 - 441 Resurfacing Improvements
Infrastructure
Results
$2,351,467 est. value
Ravenna, OH

College of Business Administration Building - Kent State University
New Construction, Infrastructure - 147,000 SF
Construction
$72,900,000 CJ est. value
Kent, OH 44240

RFQ Design - Future Community Center Building
New Construction, Infrastructure
Construction
$3,100,000 CJ est. value
Streetsboro, OH 44241

The Kensington at Anna Maria Addition
Addition, Infrastructure - 2,200 SF
Pending Verification
$600,000 CJ est. value
Aurora, OH 44202

Greens of Aurora - Phase I
New Construction, Infrastructure - 17,700 SF
Pending Verification
$5,000,000 CJ est. value
Aurora, OH 44202

Roadway Minor Rehab - SR 82
Infrastructure
Design
$1,784,000 CJ est. value
Aurora, OH 44202

Last Updated 06/21/2023 12:33 AM
Project Title

Jones PAL-106 Bridge Replacement Project

Physical Address View project details and contacts
City, State (County) Palmyra Township, OH 44412   (Portage County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $751,250 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

At the beginning following the project identification the DBE goal designation is written, i.e. DBE Goal: 10%. Each proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. The owner intends and requires that this project be completed no later than May 24, 2024. The Portage County Commissioners reserve the right to waive irregularities and to reject any or all bids. The basis of award shall be lowest and best bid.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents