Similar Projects
1130 North Drainage Improvements - City of Saint George
Infrastructure
Conception
$1,400,000 CJ est. value
St George, UT 84770

Bloomington Pickleball Courts - City of Saint George
Infrastructure
Conception
$1,174,041 CJ est. value
St George, UT 84790

White Dome Commercial
New Construction, Infrastructure - 30,000 SF
Design
$8,000,000 CJ est. value
St George, UT 84770

Monopole Tower
New Construction, Infrastructure - 100 SF
Design
$53,700 CJ est. value
St George, UT 84770

Sky Mountain Power Substation Grading and Utilities
Infrastructure
Post-Bid
Hurricane, UT

Buena Vista Boulevard Green Springs Drive to Cactus Lane
Term Contract
Post-Bid
Washington, UT

3000 E Widening / Drainage (2000 S To 1580 S)
Infrastructure
Results
Saint George, UT 84790

SR 59 - Shoulder Widening
Infrastructure
Results
$1,500,000 to $3,000,000 est. value
UT

Black Desert Resort
New Construction
Construction
Ivins, UT

Black Desert Resort
New Construction
Construction
Ivins, UT

Lugano Landing (PA-4) at Divario
New Construction, Infrastructure
Pending Verification
$49,000,000 CJ est. value
St George, UT 84770

White Dome Apartments
New Construction
Pending Verification
Saint George, UT 84790

Riverside Drive Sewer Main Replacement R 11 Reach 1 - 62-6200-7970 - City of Saint George
Infrastructure
Conception
$3,500,000 CJ est. value
St George, UT 84790

Water's Edge at Desert Color
New Construction
Design
$17,000,000 est. value
Saint George, UT 84790

Toquerville Parkway Project
New Construction, Infrastructure
Post-Bid
Toquerville, UT

Last Updated 03/30/2023 12:13 PM
Project Title

Shadow Ridge Apartments

Physical Address View project details and contacts
City, State (County) Hurricane, UT 84737   (Washington County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $6,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a new apartment building. As of March 30, 2023, building permits have been issued. The content management team has made an inquiry for the general contractor.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents