Similar Projects
Miscellaneous Concrete and Drainage Items Repair and Construction
Infrastructure, Alteration
Bidding

Trenchless Steel Pipe Installation (Bore and Jack)
Infrastructure
Bidding

Highway 11 Right of Way Mowing and Ditch Maintenance
Post-Bid
Winterville, NC

Stormwater Drainage Assistance - Chapel Hill Road Drainage Improvements
Post-Bid
Less than $317,000 est. value
Raleigh, NC 27607

Erosion and Sediment Control and Rough Grading for a new Ashe County Middle School
Results
NC

S. South Street Storm Drain - 3rd - 4th Avenue Culvert Repairs (Phase I)
Results
Gastonia, NC

Box Culvert Scour Repairs - Harnett
Infrastructure
Bidding
NC

18" N-12 HDPE IB/WT Double Wall 20"
Post-Bid
Jacksonville, NC

Bladen Bluffs Regional Surface Water Treatment
Results
Leland, NC 28451

Downtown Greenway Phase 2
Infrastructure
Bidding
Huntersville, NC 28078

Replace Grounds in the 1-7 ADA BN Motor pool X4622, Fort Bragg, NC
Post-Bid
Fayetteville, NC 28307

Amber Drive Drainage Improvements
Results
Less than $137,006 est. value
Wilmington, NC 28402

Mott Creek Stabilization/Restoration
Infrastructure
Bidding
Wilmington, NC

Streambank Repairs (Formal)
Post-Bid
Raleigh, NC

Streambank Repairs
Results
Raleigh, NC 27604

Reported 09/24/2021 12:00 AM
Project Title

Catawba River Bank Stabilization

Physical Address View project details and contacts
City, State (County) Marion, NC 28752   (McDowell County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $246,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Stabilization of a portion of the Joseph McDowell/Catawba River Greenway bank along the Catawba River. This is a segment of the Fonta Flora State Trail system, which serves as the primary bicycle and pedestrian corridor between Morganton and Asheville. The main purpose of this project is for trail stabilization and erosion control to protect the public and prevent the river from further affecting trail.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents