Similar Projects
Bridge Job Order Contract Including Guiderail and Crash Attenuators
New Construction, Infrastructure
Bidding
$1,000,000 est. value
NY

Brutus Trail Bridge "C"
Post-Bid
Auburn, NY 13021

Lorings Crossing Bridge Replacement
Renovation
Post-Bid
Cortlandville, NY

County Route 8 (Lowman Crossover) Bridge Over Chemung River
Results
Elmira, NY 14901

Replacement of Washington Drive Bridge Over Fuller Hollow Creek
Term Contract
Results
Vestal, NY 13850

Panelized Bridge Material (2021-2022)
Term Contract
Post-Bid
NY

Bridge Undermining/Scour Repair
Results
Plattsburgh, NY 12901

BQE Structural Minor Rehabilitation (When & Where)
Renovation, Term Contract
Post-Bid
$40,000,000 est. value
Brooklyn, NY 11201

Main Street Over Chemung River Bridge Rehabilitation
Results
Elmira, NY 14901

Mansfield Bridge 50, Hinman Hollow Road over Mansfield Creek
New Construction, Demolition, Infrastructure
Post-Bid
Little Valley, NY

Replacement of Rte. 11 Bridge Over I-81 With Construction of Roundabouts at on and Off Ramp Intersections
Results
Less than $18,300,000 est. value
Dickinson, NY 12930

Bridge Superstructure Replacement of County Route 405 (Sunset Hill Road) over Basic Creek and Old Ravena Road over Coeymans Creek
Renovation
Post-Bid
NY

Replacement of County Road 20 Bridge Over Tannery Creek
Results
Cuba, NY

Reconstruction of Williamsburg Bridge and Miscellaneous Rehabilitation
New Construction, Renovation
Post-Bid
Brooklyn, NY 11201

North Sanford Road (CR 241) Bridge Over Oquaga Creek Bridge Replacement (3349630)
Results
Deposit, NY

Last Updated 05/06/2022 05:21 AM
Project Title

Stop 13 Road Bridge Over Wynants Kill Creek

Physical Address View project details and contacts
City, State (County) West Sand Lake, NY 12196   (Rensselaer County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the rehabilitation or replacement of the existing bridge on Stop 13 Road over the Wynants Kill. The existing bridge is approximately 36 feet long and 17 feet wide constructed with 6 steel beams with a concrete deck overlaid with asphalt. The new bridge will meet current bridge standards, 60 feet long 25’4” wide, and carry 2 lanes of traffic. The project only involves replacement of the bridge and approximately 50 feet of roadway approach on either end of the bridge.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents