Similar Projects
WIS 178, Olson Drive Intersection - Wisconsin Department of Transportation
Infrastructure
Conception
$1,400,000 CJ est. value
Chippewa Falls, WI 54729

WIS 178, Olson Drive Intersection - Wisconsin Department of Transportation
Infrastructure
Conception
$1,400,000 CJ est. value
Chippewa Falls, WI 54729

Augusta - Cadott Construction / CIR / Resurface
Infrastructure
Design
$4,000,000 CJ est. value
Cadott, WI 54727

Augusta - Cadott Construction / CIR / Resurface
Infrastructure
Design
$4,000,000 CJ est. value
Cadott, WI 54727

8th Street Resurfacing
Infrastructure
Bidding
$390,000 CJ est. value
Cornell, WI 54732

8th Street Resurfacing
Infrastructure
Bidding
$390,000 CJ est. value
Cornell, WI 54732

Transit Transfer Center Bid Package No. 3
Renovation, Infrastructure
Post-Bid
Eau Claire, WI

Transit Transfer Center Bid Package No. 3
Renovation, Infrastructure
Post-Bid
Eau Claire, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Paving Bid
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Roadway Repaving Lake Wissota State Park
Infrastructure
Pending Verification
$727,350 CJ est. value
Chippewa Falls, WI 54729

Roadway Repaving Lake Wissota State Park
Infrastructure
Pending Verification
$727,350 CJ est. value
Chippewa Falls, WI 54729

RFQ Engineering - NWC Security System Upgrade
Infrastructure
Conception
$560,000 CJ est. value
Chippewa Falls, WI 54729

Last Updated 02/20/2023 09:11 AM
Project Title

2022-2023 Reconstruction - Phase 2

Physical Address View project details and contacts
City, State (County) Bloomer, WI 54724   (Chippewa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work on this contract consists of providing all labor, materials, tools, and equipment necessary for reconstructing City streets including sanitary sewer, water main, storm sewer, curb and gutter, and other improvements. Bids will be received for a single prime Contract. Bids shall be on a unit price basis as indicated in the Bid Form. Bids shall be on the forms provided for that purpose and per the Contract Documents prepared by CBS Squared Inc. identified as "2022-2023 Reconstruction: Phase 2". A pre-bid conference will not be held. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder in accordance with the Instructions to Bidders. The City of Bloomer reserves the right to retain the deposits of the three (3) lowest bidders for a period not to exceed 30 days after the date and time set for the opening of bids. Bidders must submit a Bidders Proof of Responsibility in accordance with the Instructions to Bidders. Bidders will be required to provide performance and payment bonds of 100 percent of bid amount. This Contract is expected to be funded in part with funds provided by the United States Department of Agriculture, Rural Utilities Service (RUS). Information on applicable federal requirements is contained in the Project Manual. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All listed iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. The following waivers apply to this Contract: De Minimis, Minor Components, Pig iron and direct reduced iron, and project specific waivers: TBD. The successful bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Related Acts which requires that all laborers and mechanics employed by contractors and sub -contractors performing on contracts funded in whole or in part with federal funds in excess of $2,000 pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, as determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area. If the requirements of Davis Bacon, the State of Wisconsin, and the Contract requirements conflict with regard to wages, the highest of the three shall apply. The Owner encourages DBE's, MBEs, WBEs, and SBRAs to submit Bid proposals. Equal Opportunity and Affirmative Action requirements apply to this Project. The Offeror's or Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specification" included in the specifications. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: Goals for minority participation for each trade = 0.5% (Chippewa County) Goals for female participation in each trade = 6.9% The City of Bloomer reserves the right to reject any and all bids, without cause, to waive irregularities and informalities therein and to award the Contract in the best interest of the City of Bloomer.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents