Similar Projects
Berkley Road Water Treatment Plant - Well No. 3
Infrastructure
Bidding
Auburndale, FL 33823

Southwest Water Treatment Plant Production Well 3 Construction and Testing
Infrastructure
Bidding
$1,500,000 est. value
FL

Wet Well Cleaning
Post-Bid
North Port, FL

Well Testing, Drilling And Maintenance
Demolition, Term Contract
Post-Bid
FL

New Condenser Water Return Well No.2
Term Contract
Results
Tallahassee, FL 32307

Live Oak Drainage Wells Phase 1
Results
Less than $400,000 est. value
Live Oak, FL

Water Treatment Plant 11 Supply Wells and Upgrades
Infrastructure
Bidding
$1,700,000 est. value
Deltona, FL

Construction Services for the Cypress Lake Wellfield Production Wells
Post-Bid
Kissimmee, FL

Reuse Irrigation Transfer Pumps
Results
Palatka, FL 32177

ROMP 88.5 - Northeast Polk Upper Floridan Aquifer Monitor Well Construction
Infrastructure
Bidding
Polk City, FL 33868

Progressive Cavity Pump - Sludge Feed Pump
Post-Bid
Port Saint Lucie, FL

Pump Rehabilitation and Repair
Results
Cape Coral, FL 33915

105th Ave North And 106th Ave North Public Utilities Renewal
Infrastructure
Bidding
North Naples, FL 34108

Southwest Water Treatment Plant 3 Test Well Specifications
Post-Bid
Kissimmee, FL

NCWRF RML Pump System Improvements
Results
Less than $937,000 est. value
Naples, FL 34112

Last Updated 05/10/2022 08:22 AM
Project Title

Purchase of Eight (8) Vertical Turbine Pumps

Physical Address View project details and contacts
City, State (County) Vero Beach, FL   (Indian River County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To construct a new Stormwater Intake Station and Filtration System (Project) within the COVBWS’s Water Treatment Facility (WTF). The facilities shall provide stormwater collection infrastructure to deliver 3 to 4 Million Gallons a Day (MGD) of treated stormwater as irrigation supply. Given the long lead times for the pumps/motors, the City of Vero Beach has elected to directly procure eight (8) vertical turbine pumps. The Intake station just north of the Indian River Farms Water Control District Main Relief Canal right-of-way will be equipped with four (4) pumps, delivering approximately 1.0 MGD per pump at 42-feet of head. The re-pump station located within the COVBWS water treatment plant premises will be equipped with four (4) pumps, delivering approximately 1.0 MGD at 220-feet of head.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents