Similar Projects
Removal and Replacement of 46 Existing Culverts
Post-Bid
Less than $17,400,000 est. value

Scheduled and Emergency Drainage Repairs and Improvements at Various Locations (including Martha's Vineyard)
Results
Less than $1,163,000 est. value

Mills Avenue - Erosion Repair
Results
$40,000 est. value
Revere, MA

Scheduled and Emergency Drainage and Erosion Repairs at Various Locations (Including Martha's Vineyard)
Results
Less than $710,000 est. value

Drainage System Improvements, City-Wide
Results
Less than $192,000 est. value
Boston, MA 02118

Long Wharf Seawall Stabilization
Post-Bid
Boston, MA 02110

FY 19-21 Small Item Waterfront Repair
Term Contract
Results
Less than $200,000 est. value
East Boston, MA 02128

Retaining Wall Removal and Replacement
Results
Hyde Park, MA 02136

Catchbasin/Manhole Rehab and Pipe
Post-Bid
Less than $4,300,000 est. value
Boston, MA

Drainage Installation Services
Post-Bid
Boston, MA

Scheduled and Emergency Catch Basin and Drainage System Cleaning at Various Locations in Areas A, B, C and D (Excluding Martha's Vineyard and Nantucket Island)
Results
Less than $1,050,000 est. value

Beachmont - Sales Creek Neighborhood Sewer and Drainage Improvements
Results
Less than $630,000 est. value
Revere, MA

Retaining Wall Removal and Replacement and Chain Link Fence Removal and Replacement
Results
Boston, Hyde Park, MA 02136

Black Falcon Cruise Terminal Phase II Seawall Structural Rehabilitation
Results
Less than $2,345,000 est. value
Boston, MA 02210

Pier 4 Culvert and Sinkhole Repairs
Post-Bid
Less than $700,000 est. value
Boston, MA

Reported 04/12/2019 12:00 AM
Project Title

Coughlin Park Shoreline Stabilization

Physical Address View project details and contacts
City, State (County) Winthrop, MA   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $198,850
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description Furnishing and installing fiber roles, cobbles, erosion controls, symbolic fencing, and plantings to stabilize approximately 350 linear feet of shoreline at Coughlin Park; and all materials and equipment, services and construction inherent to the Work.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents