Similar Projects
Last Updated | 03/29/2019 11:08 AM |
Project Title | Grover Cleveland Middle School Boiler Replacement and District Wide Energy Management System |
Physical Address | View project details and contacts |
City, State (County) | West Caldwell, NJ (Essex County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric, Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Energy Savings Plan (ESP) for this project contains several Energy Conservation Measures (ECM) that will be implemented at the Districts facilities. This project is the installation of ECMs 2 and 6. ECM 2 is the installation of a District Wide Energy Management System. The general scope of this ECM is to remove existing pneumatic controls and replace or integrate existing proprietary systems with new DDC Controls. ECM 6 of the ESP is the Boiler Replacement at Grover Cleveland Middle School. The general scope of this project is to demolish the existing boiler plant and replace with a new, high efficiency condensing boiler plant, including pumps, air separator, expansion tanks and a new domestic water heater, as well as all associated work. | ||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |