Last Updated 03/29/2019 11:08 AM
Project Title

Grover Cleveland Middle School Boiler Replacement and District Wide Energy Management System

Physical Address View project details and contacts
City, State (County) West Caldwell, NJ   (Essex County)
Category(s) Single Trades
Sub-Category(s) Electric, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Energy Savings Plan (ESP) for this project contains several Energy Conservation Measures (ECM) that will be implemented at the Districts facilities. This project is the installation of ECMs 2 and 6. ECM 2 is the installation of a District Wide Energy Management System. The general scope of this ECM is to remove existing pneumatic controls and replace or integrate existing proprietary systems with new DDC Controls. ECM 6 of the ESP is the Boiler Replacement at Grover Cleveland Middle School. The general scope of this project is to demolish the existing boiler plant and replace with a new, high efficiency condensing boiler plant, including pumps, air separator, expansion tanks and a new domestic water heater, as well as all associated work.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 26 - Electrical.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents