Similar Projects
Women's Baseball Center Museum - City of Rockford
New Construction, Infrastructure
Conception
$7,000,000 CJ est. value
Rockford, IL 61101

ENGIE Solar Farm
Infrastructure
Conception
$5,000,000 CJ est. value
Rockford, IL 61108

Alpine Dam Modernization Phase 2 - City of Rockford
Infrastructure
Design
$22,400,000 CJ est. value
Rockford, IL 61101

Colman Yards Barber Colman Mixed-Use Development
New Construction, Infrastructure, Build-out
Design
$400,000,000 CJ est. value
Rockford, IL 61101

Rock Cut Elementary Gymnasium Addition Rebid and Harlem Middle School
Addition, Demolition, Infrastructure - 4,825 SF
Bidding
$3,000,000 CJ est. value
Loves Park, IL 61111

Ramp Pavement Repairs
Infrastructure
Bidding
$100,000 CJ est. value
Rockford, IL 61101

Pipe Culvert
Infrastructure
Post-Bid
Rockford, IL

Manhole Frames And Lids
Alteration
Post-Bid
Rockford, IL

Pecatonica Commercial Development
Infrastructure
Results
Pecatonica, IL 61063

City-Wide Inlet Repairs 2022
Infrastructure
Results
Rockford, IL

Fleet Farm Retail Development
New Construction, Infrastructure
Pending Verification
$9,000,000 CJ est. value
Rockford, IL 61112

NorthPointe Birth Center
New Construction, Infrastructure - 8,700 SF
Pending Verification
$5,115,937 CJ est. value
Roscoe, IL 61073

Harlem High School Addition - Harlem Consolidated School District #122
Addition, Demolition, Infrastructure - 27,000 SF
Design
$13,500,000 CJ est. value
Machesney Park, IL 61115

Asphalt Paving Projects for Macktown, Trask Bridge and Klehm Arboretum
Infrastructure
Bidding
$200,000 CJ est. value
Rockford, IL 61101

Gym Floor Asbestos Abatement
Term Contract, Infrastructure
Post-Bid
$121,000 CJ est. value
South Beloit, IL 61080

Last Updated 03/24/2023 01:46 AM
Project Title

Well 45 Reservoir Reconstruction - City of Rockford

Physical Address View project details and contacts
City, State (County) Rockford, IL 61102   (Winnebago County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2025
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will replace the 100 year reservoir and include site improvements located at well 45 and site. This project will be financed utilizing the annual well/reservoir maintenance and repair allocation, and IEPA SRF loan program. The project is estimated to cost approximately $15 million This project is in included in the City of Rockford FY 2022-2026 Capital Improvement Plan (CIP). As of March 01, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents