Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Major Reconstruction - CUY-East 185th Streetscape
Infrastructure
Bidding
$10,228,400 est. value
Cleveland, OH

Two Lane Resurfacing - CUY-US 6/US 20-24.44/27.78
Infrastructure
Bidding
$4,656,456 est. value
Euclid, OH

Remove Rubber and Other Contaminants from Paved Surfaces
Post-Bid
Cleveland, OH

Hotel Road Rehabilitation Project
Post-Bid
Cleveland, OH

West 65th Street Rehabilitation
Results
$4,495,914 est. value
Cleveland, OH 44114

CUY-Euclid Avenue/East 260th Street Improvements
Results
$150,000 est. value
Euclid, OH 44117

General Pavement Services for 2022
Infrastructure
Bidding
Strongsville, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

East 105th Street Greenlawn Avenue to North City Limits
Results
$5,958,904 est. value
Cleveland, OH

2022 Street Resurfacing and Ada Curb Ramp Replacement Program CDBG Funded Project
Infrastructure
Bidding
Cleveland Heights, OH

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Four Lane Resurfacing - West 14th Street
Results
OH

Adult Education Renovation
Renovation
Bidding
$225,000 est. value
Brecksville, OH 44141

Redevelopment of 3568 Lee Road
Infrastructure
Post-Bid
Shaker Heights, OH 44120

Last Updated 03/29/2022 12:43 PM
Project Title

2022 Street Improvement Program

Physical Address View project details and contacts
City, State (County) Beachwood, OH   (Cuyahoga County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Roadways 1. Blossom Lane – Repair and Resurface 2. Central Parkway – Repair and Resurface 3. East Groveland Road (Beachwood to Lyndway) – Repair and Resurface 4. Enterprise Parkway – Repair and Resurface 5. Halburton Road (West Corp. Line to Belvoir) – Repair and Resurface 6. Halworth Road (West Corp. Line to Belvoir) – Repair and Resurface 7. Letchworth Road (Bryden to School Drive) – Repair and Resurface 8. Letchworth Road (School Drive to Richmond) - Cement Stabilization and Resurface 9. Science Parkway – Repair and Resurface 10. Willow Lane – Repair and Resurface 11. Woodside Lane (Cul-de-sac to Sulgrave) – Repair and Resurface Note: The Contractor can only work on 5 streets at a time and Letchworth Road cannot begin until school is out for the summer (6 June 2022). Parking Lots 1. Police Parking Lot @ Richmond Road A. Mill and Fill 3” of asphalt pavement B. Perform pavement base repairs as directed. Repairs shall be flexible pavement repairs. C. Adjust castings to grade as necessary D. Replace concrete curbs as directed. E. Restripe the lot with temporary pavement markings immediately and in 30 days come back and install permanent pavement markings. F. Replace traffic loop detector at Richmond Road intersection.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents