Similar Projects
Blower System
Renovation
Sub-Bidding
Chambersburg, PA 17201

Plumbing Services (CD)
Term Contract
Sub-Bidding
Pittsburgh, PA 15219

SCI Huntingdon - Replace Condensate
Alteration
Post-Bid
$1,000,000 to $2,000,000 est. value
Huntingdon, PA 16654

Bid Package 2 - Interior Renovations and Upgrades - Plumbing Construction
Alteration
Post-Bid
Berwyn, Devon, Wayne, PA 19333

Welded Steel Water Storage Tank Maintenance Contract
Term Contract
Results
Less than $35,000 est. value
Washington Crossing, PA 18977

Well Pump/Piping Install and Treatment System Upgrade - Plumbing
Results
$28,365 est. value
Woodward, PA 16882

Plumbing Alterations at Susquehanna Township High School and Susquehanna Township Middle School
Alteration
Post-Bid
Harrisburg, PA 17109

Municipal Building Renovations - Plumbing Construction
Alteration
Results
Pittsburgh, PA 15227

Renovations to the High School Science Classrooms - Plumbing Construction
Alteration
Post-Bid
Flinton, PA 16640

Alterations and Addition Hampton High School - Plumbing Construction
Alteration
Results
Allison Park, PA 15101

Plumbing Materials
Alteration
Post-Bid
Scranton, PA

High School Athletic Improvements - Plumbing Construction
Alteration
Results
Claysburg, PA 16625

Washington Township Office Complex - Plumbing Construction
Alteration
Post-Bid
Waynesboro, PA 17268

Fall 2021/Spring 2022 Halderman Field - Plumbing Construction
Alteration
Results
Springfield, PA

Water Resource Recovery Facility - Contract 22-02 Electrical Construction
Renovation
Post-Bid
$9,482,700 CJ est. value
Dubois, PA 15801

Last Updated 07/01/2023 09:31 AM
Project Title

Johnston Street Sewer Relocation

Physical Address View project details and contacts
City, State (County) Linden, PA 17744   (Lycoming County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $148,975 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but is not limited to, the installation of approximately 130 Lineal Feet of 24" PS115, ASTM F679 sanitary sewer pipe; four (4) sanitary manholes, wyes, laterals, and cleanouts; grouting and abandonment of existing sewers; clearing and grubbing; traffic control; resident notification; erosion and sedimentation control measures; existing utility protection; cistern removal; and associated site restoration, complete in place. Proposals shall be made to Crafton Borough, Allegheny County, Pennsylvania, and shall remain firm for a period of sixty (60) days. No Bidder may withdraw his Proposal during the sixty (60) day period without forfeiting his Bid guarantee. Performance, Maintenance, and Labor and Material Payment Bonds, along with Public Liability and Property Damage Certificates of Insurance in the amounts specified, as well as Certificates of Workman's Compensation must be filed with the executed Agreement upon acceptance of the Proposal from the successful Bidder. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents