Similar Projects
Women's Baseball Center Museum - City of Rockford
New Construction, Infrastructure
Conception
$7,000,000 CJ est. value
Rockford, IL 61101

ENGIE Solar Farm
Infrastructure
Conception
$5,000,000 CJ est. value
Rockford, IL 61108

Aerobic Granular Sludge - Phase I
Infrastructure, Renovation
Bidding
$38,700,000 CJ est. value
Rockford, IL 61109

Aerobic Granular Sludge - Phase I
Infrastructure, Renovation
Bidding
$38,700,000 CJ est. value
Rockford, IL 61109

Rock Cut Elementary School Gymnasium Addition Harlem High School Early PreCast Package
Addition, Demolition, Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Machesney Park, IL 61115

2021 Overlay
Alteration
Post-Bid
Loves Park, IL

Installation of Oversized Chevrons along Interchange Ramp Curves at Various Locations
Infrastructure
Post-Bid

Alpine Road Improvements
Results
$2,920,808 est. value
Machesney Park, IL

River Lane Reconstruction
Infrastructure
Results
Loves Park, IL 61111

Fleet Farm Retail Development
New Construction, Infrastructure
Pending Verification
$9,000,000 CJ est. value
Rockford, IL 61112

NorthPointe Birth Center
New Construction, Infrastructure - 8,700 SF
Pending Verification
$5,115,937 CJ est. value
Roscoe, IL 61073

Water Supply Well No. 7 Test Hole
Infrastructure
Bidding
$800,000 CJ est. value
Machesney Park, IL 61115

Parking Lot Crack Filling, Seal Coating, and Striping
Infrastructure
Post-Bid
Rockton, IL 61072

2021 Residential Streets Program
Infrastructure
Results
Roscoe, IL 61073

Hard Rock Casino
Demolition, New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Rockford, IL 61108

Last Updated 01/11/2023 08:35 AM
Project Title

Replacement of the Four-span Bridge (Sn 101-0098) With a Twospan

Physical Address View project details and contacts
City, State (County) Loves Park, IL 61111   (Winnebago County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $7,982,288 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Replace the four-span bridge (SN 101-0098) carrying Perryville Road over I-39 with a two-span continuous, steel plate girder bridge. Region 2 District 2 Federal Project # PROTQ7IK(050) County(s) Winnebago Key Route(s) FAI 39 Marked Route(s) I-39 Section(s) 4HBR-3 State Job #(s) C-92-025-19 PPS #(s) 2-13590-0000 Project Labor Agreement Completion Date: 110 Working Days Questions not accepted as of November 08, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, October 28, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 067 - Replace the four-span bridge (SN 101-0098) carrying Perryville Road Original Report Date: 07/09/2021 Proposed SN: 101-0206 Route: F.A.I. 39 (I-39) Revised Date: Existing SN: 101-0098 Section: 4HBR-3 This project includes the complete replacement of the four-span bridge (SN 101-0098) with a twospan continuous, steel plate girder bridge (SN 101-0206). The structure is skewed 50-06'-11" right-forward. The horizontal alignment of Perryville Road is tangent. The roadway profile will be raised to provide a minimum of 17'-4" vertical clearance over the future interstate. I-39 currently has 2 lanes in each direction, and the new structure will also provide lateral and vertical clearance for a future 3 rd and 4 th lane in each direction. The horizontal alignment of I-39/US Bypass 20 is tangent under the structure. Traffic on Perryville Road will be maintained using detours, and I39/US Bypass 20 will be maintained with lane shifts and will have short term nighttime closures during beam removal and girder erection. Roadway improvements include the construction of concrete approach slabs, pavement connectors, HMA pavement and resurfacing, and combination concrete curb and gutter.The improvements also include HMA shoulders, guardrail, pavement markings, storm sewers, and seeding.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.