Similar Projects
2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

Visitor Center Breezeway and Bridge Restoration 36698
Renovation, Infrastructure
Design
$250,000 to $500,000 est. value
Harpers Ferry, IA 52146

Construction of Sidewalks, a Parking Lot, Driveway, Retaining Walls, Storm Drainage System, and Grading
Infrastructure
Bidding
$800,000 est. value
Corning, IA 50841

2022 Street Improvements
Infrastructure
Bidding
$538,000 est. value
Corning, IA

Easton Valley High School Parking Lot
Infrastructure
Post-Bid
Preston, IA 52069

10th Avenue Sidepaths
Infrastructure
Post-Bid
IA

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

High Trestle Trail Trailhead Parking Lot
Results
Ankeny, IA 50023

Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

Center Street Corridor Streetscaping
Infrastructure
Bidding
$300,000 est. value
Cedar Falls, Cedar Rapids, IA 52401

Cedar Valley Nature Trail Rehabilitation
Infrastructure
Post-Bid
$180,000 est. value
Ely, IA

Gilbert Court Sidewalk Infill
Results
Iowa City, IA

Lindale Trail Phase I from Council Street to E/o C Avenue North East
Conception
$2,600,000 est. value
Cedar Rapids, IA 52407

PCC Sidewalk/Trail
Infrastructure
Bidding
$125,000 to $250,000 est. value
Stuart, IA 50250

Reported 05/27/2022 12:00 AM
Project Title

Greenbelt Trail Expansion Phase 2

Physical Address View project details and contacts
City, State (County) Stanton, IA   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $470,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the following approximate principal quantities: excavation , class 10, roadway and borrow 420 cy topsoil, strip, salvage and spread 415 cy special compaction of subgrade 8 sta recreational trail, portland cement concrete, 5 in. 650 sy.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents