Similar Projects
Main Jail - Climate Control System Upgrade - P111497 - Sacramento County
Renovation
Conception
$6,300,000 est. value
Sacramento, CA 95814

B.T. Collins Youth Detention Facility - Visitor's Center - Replace Roof - P166342 - Sacramento County
Renovation
Conception
$350,000 est. value
Sacramento, CA 95827

Sheriff Administration Building - Carpet, Paint and Minor Tenant Improvements - P000559 -County of Sacramento
Renovation
Design
$480,000 est. value
Sacramento, CA 95814

Precast Products
Alteration
Bidding
Sacramento, CA

Mangini Ranch Phase 2 Village 3 Concrete
Alteration
Sub-Bidding
$1,000,000 est. value
Folsom, CA

Tree Service
Term Contract
Sub-Bidding
Folsom, CA 95630

2 Inmate or Ward Labor Program Concrete Pumping Services
Alteration
Post-Bid
$6,995,500 est. value
Sacramento, CA

Cold Plane AC Pavement, Place HMA and Replace Concrete Slabs
Infrastructure, Alteration
Post-Bid
$4,860,000 est. value
CA

On-Call Concrete Repairs For Water Storage Structures
Term Contract
Results
$4,000,000 est. value
CA

North Area Recovery Station Waste Tipping Building Pavement Rehabilitation
Term Contract
Results
$365,000 est. value
Sacramento, CA 95827

B.T. Collins Youth Detention Facility - Visitor's Center - Americans with Disabilities Act - Public Interior
Renovation
Conception
$3,990,000 est. value
Sacramento, CA 95827

Repair of Proto II Perimeter Wall
Alteration
Post-Bid
Sacramento, CA 95835

Rio Cosumnes Correctional Center - Construct New Central Plant - P093879 - Sacramento County
Renovation
Conception
$5,600,000 est. value
Elk Grove, CA 95757

Mangini Ranch Savannah Parkway Concrete
Infrastructure
Post-Bid
Folsom, CA

Rio Cosumnes Correctional Center - Christopher Boone Facility - Replace 12 Rooftop Air Conditioning Units - P000236
Renovation
Conception
Less than $490,000 est. value
Elk Grove, CA 95757

Last Updated 07/25/2022 04:05 AM
Project Title

Concrete Cutting Services

Physical Address View project details and contacts
City, State (County) zh, CA 93510   (Los Angeles County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Concrete, Prison/Jail
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This is an Agreement in which the Contractor shall perform Concrete Cutting and Demolition Services. The Contractor will be compensated for the services in accordance with the rates specified in Exhibit B-1, Public Works Rate Sheet; which shall include all labor, equipment, parts, devices, materials, tools, licenses, supervision, bonds, insurance, travel and per diem, and any other costs necessary to perform services, for the Health Care Facility Improvement Program located at the California Department of Corrections and Rehabilitation (CDCR) Inmate/Ward Labor (IWL) Program, Substance Abuse Treatment Facility (SATF), 900 Quebec Ave, Corcoran CA 93212.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents