Similar Projects
Cypress Lake United Methodist Church Multipurpose Facility
New Construction, Addition - 18,262 SF
Conception
$500,000 to $1,000,000 CJ est. value
Fort Myers, FL

Freedom Crossing - Master Plan
New Construction - 534,000 SF
Conception
Ocala, FL

Safe & Secure Self Storage
New Construction - 220,100 SF
Design
$10,000,000 CJ est. value
Oakland Park, FL 33311

Studio Works
New Construction - 22,671 SF
Design
$1,950,000 est. value
Hobe Sound, FL 33455

U-Haul Moving and Storage of LaVilla
New Construction - 14,159 SF
Bidding
$1,000,000 est. value
Jacksonville, FL 32204

HWO Border Patrol Building Demolition
Renovation, Demolition
Bidding
Pembroke Pines, FL 33023

Pre-Fabricated Metal Building at GTLWWTP Design Build
New Construction - 8,265 SF
Post-Bid
$1,300,000 est. value
Fort Lauderdale, FL 33316

Capital Circle Climate Controlled Self Storage
New Construction, Demolition - 33,659 SF
Post-Bid
Tallahassee, FL

Flight Line Munitions Storage Area (MSA) Facilities, Tyndall AFB, FL
Results
$25,000,000 to $100,000,000 est. value
Panama City, FL

South Water Reclamation Facility North Plant Effluent Pump Station Pre-Engineered Electrical Building
New Construction
Results
Less than $3,200,000 est. value
Orlando, FL 32819

Eliza Road Warehouse
New Construction - 7,700 SF
Construction
$487,000 est. value
Tallahassee, FL 32308

Jensen Beach Auto Vault
New Construction - 231,075 SF
Construction
$2,999,998 est. value
Jensen Beach, FL 34957

Pasco Maximus Self Storage
New Construction - 360,426 SF
Pending Verification
$10,000,000 CJ est. value
Zephyrhills, FL 33544

Marlow Marine
Addition - 13,200 SF
Pending Verification
Palmetto, FL

Attic Safe Self Storage
New Construction - 89,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Miami, West Little River, FL 33147

Last Updated 03/08/2022 11:56 AM
Project Title

Countryside Storage

Physical Address View project details and contacts
City, State (County) Clearwater, FL 33761   (Pinellas County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Construction Commenced April 2021, Construction Completion Expected June 2022
Bids Due View project details and contacts
Estimated Value $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Warehouse/Storage, 5 Stories Above Grade, 98,311 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents